flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Long Beach office building reflects Mid-Century Modern garden-style motif

New Long Beach office building reflects Mid-Century Modern garden-style motif

Built on former oil well site that had been considered undevelopable.


By Peter Fabris, Contributing Editor | September 20, 2022
Laserfiche Headquarters ext
Courtesy Paul Vu.

The new Long Beach, Calif., headquarters of Laserfiche, a provider of intelligent content management and business process automation software, was built on a brownfield parcel previously considered undevelopable. The project began with capping eight abandoned oil wells and included the removal of several storage tanks. The 102,840 sf development consists of four floors and a parking garage. The building can accommodate 550 full time in-office employees, or up to 750 hybrid workers.

Constructed on a prominent corner of a new tech corridor in northern Long Beach, the building’s design gives nods to a garden office structure across the street designed by Mid-Century Modern architect Ed Killingsworth. The scale and style of that iconic building provided a design reference point. The massing of the structure is turned 90 degrees and stepped back at the upper floors to relate to the scale of the garden office. The upper floors then slide to shade the building on the south face and create decks on the north face for socializing and connecting to nature via treetops and mountain views.

The building core is located on the west facade to minimize the need for windows, resulting in a dramatic reduction of afternoon heat gain. Moving the core from the center of the building to the western edge also created an expansive connected work area providing flexibility in the work environment. Two locations have dramatic double height spaces. One, located at the entry, provides for a two story “outdoor porch” and lobby with a tranquility koi pond. The second location, called “Skylab,” is positioned on the top floor with views of downtown Long Beach, the Pacific Ocean, and the Palos Verdes Peninsula. This a flexible “ideation space” for employee teams and serves as a beacon to motorists traveling on the busy 405 Freeway.

Each floor features individual work areas, large and small conference spaces, and expansive flex areas that can be rearranged with mobile furniture. Wide and naturally lit stairwells connect all levels, providing inviting passageways that encourage use to promote health and wellness. Natural wood, stone, and concrete paired with the brand color of dark blue and distinctive orange guide and define the palette.

The project aimed for LEED Platinum. The design considers water consumption and rainwater retention, as well as energy uses, air quality, and ventilation. Vertical and horizontal fins increase energy efficiency and promote thermal comfort by providing solar shading to the building. All employees have access to natural light at their workstations.

On the Building Team:
Owner and/or developer: Laserfiche
Design architect: Studio One Eleven
Architect of record: Studio One Eleven
MEP engineer: Southland Engineering
Structural engineer: Structural Focus
General contractor/construction manager: Millie & Severson

Laserfiche Headquarters ext 2
Courtesy Paul Vu.
Laserfiche Headquarters ext 3
Courtesy Paul Vu.
Laserfiche Headquarters int
Courtesy Paul Vu.
Laserfiche Headquarters int 2
Courtesy Paul Vu.

 

Related Stories

Office Buildings | May 2, 2019

HOK’s latest study takes a new look at tech workplaces

The report provides insight into the relative importance of such things as amenities and occupant health for recruiting and retaining workers.

Office Buildings | Apr 25, 2019

Study: Half of corporate and government offices offer wellness programs

Nearly 30% of worksites offer programs for physical activity and fitness, according to the CDC.

Office Buildings | Apr 8, 2019

It’s time for office amenities to get to work

Amenities with the greatest impact on effectiveness and experience are those that directly support the work needs of individual employees and their teams. 

Office Buildings | Apr 8, 2019

Denver office building features 13,000 sf green roof

Dynia Architects designed the building.

Office Buildings | Apr 5, 2019

2019 trends in the workplace

From retention and career advancement to the ethics of inclusion and diversity, these five trends will play a major role this year in design, strategic planning and workplace development.

Industrial Facilities | Mar 10, 2019

The burgeoning Port San Antonio lays out growth plans

Expansions would accommodate cybersecurity, aerospace, and defense tenants, and help commercialize technologies.

Office Buildings | Mar 6, 2019

How to leverage design and culture’s two-way relationship for better workplaces

The relationship between workplace design and company culture isn’t all that different from a tango.

Office Buildings | Feb 15, 2019

A healthier perspective: Office developers bet on wellness amenities to attract top-notch tenants

Owners and developers are driving demand for wellness features and practices—active stairways, biophilia, enhanced air quality, etc.—as one more way draw tenants. 

Office Buildings | Feb 15, 2019

Vancouver’s new office building will be a stack of reflective boxes

OSO and Merrick Architecture designed the building.

Office Buildings | Feb 11, 2019

Real-world wellness pays off

3form, a materials manufacturer, did a top-to-bottom remodel of its Salt Lake City headquarters campus that included adding a 14,500-sf gym.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â