flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New living/learning facility at the University of Illinois at Chicago breaks ground

University Buildings

New living/learning facility at the University of Illinois at Chicago breaks ground

Solomon Cordwell Buenz (SCB) designed the facility.


By David Malone, Associate Editor | January 18, 2018
UIC's new living/learning complex

Rendering courtesy of SCB

A new academic and residential complex is under construction on the University of Illinois at Chicago (UIC) campus. The facility will comprise a two-story academic classroom building and a 10-story undergraduate residence hall.

The $100 million Solomon Cordwell Buenz-designed complex will offer 550 beds in a mix of traditional dorm rooms and suite-style units. The building will also house 16,000 sf of shared spaces such as lounges for studying and student interaction, offices, laundry rooms, a fitness center, a 10th-floor sky lounge, and 1,600 sf of retail space expected to house a coffee shop.

 

Interior uf UIC's new living/learning complexRendering courtesy of SCB.

 

The academic component of the project will include 51,000 sf of classroom space featuring three large lecture halls, active learning classrooms, several small group study rooms, a tutoring center, and collaboration spaces.

The building will use glass, light concrete panels, and natural materials and provide more transparent and well-lit environments than older UIC buildings. “The building was designed with a nod to Walter Netsch (the original architect of the campus),” says Jim Curtin, Design Principal, SCB, in a release.

 

Lecture hall in UIC's new living/learning complexRendering courtesy of SCB.

 

The project is part of a public-private partnership between UIC and American Campus Communities. It is expected to be completed by July 2019.

 

Academic portion of UIC's new living learning complexRendering courtesy of SCB.

Related Stories

Education Facilities | Aug 21, 2018

Meet the new vo-techs

Career and technical education is preparing K-12 students earlier than ever for college and the job market.

Education Facilities | Aug 20, 2018

More districts are reusing empty offices, stores, and other buildings to upgrade their schools

Older schools, with their small windows and rooms and creaky infrastructure, are tough and expensive to retrofit.

Education Facilities | Aug 14, 2018

Making schools more secure is imperative, but how best to do that isn't settled yet

In the first 21 weeks of 2018 alone, there were 23 school shootings where someone was killed or injured, according to CNN.

Education Facilities | Aug 13, 2018

Is STEM running out of steam?

Has STEM, which the business community urged school districts to embrace, been oversold as a career path?

Education Facilities | Aug 7, 2018

High-tech instruction space trains students in manufacturing robots

Harley Ellis Devereaux served as lead designer and lab planner for the project.

Education Facilities | Jul 11, 2018

Why school architects must understand how students learn

Would instruction be more effective if students spent less time passively listening to lectures and more time actively learning through activities, discussions, and group work? 

Education Facilities | Jul 6, 2018

Building for growth: Supporting gender-specific needs in middle school design

Today, efforts toward equity in education encompass a wide spectrum of considerations including sex, gender identity, socio-economic background, and ethnicity to name a few.

University Buildings | Jul 5, 2018

Brown University’s Engineering Research Center increases the university’s School of Engineering lab space by 30%

KieranTimberlake designed the facility and Shawmut Design and Construction was the general contractor.

boombox1
boombox2
native1

More In Category


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021