flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New LEED 2009 projects will have to meet increased minimum energy performance

Codes and Standards

New LEED 2009 projects will have to meet increased minimum energy performance

New requirements went into effect April 8.


By Peter Fabris, Contributing Editor | April 11, 2016
New LEED 2009 projects will have to meet increased minimum energy performance

Photo: Cygnusloop99 via Wikimedia Commons.

The U.S. Green Building Council recently announced that all new projects registering for LEED 2009 beginning on April 8, 2016 will need to satisfy increased minimum energy performance thresholds.

Projects must now earn a minimum of four points in the Energy Performance credits. The referenced energy standard and modeling requirements in LEED 2009 will not change. Buildings falling under the proposed change can use the same methodologies and referenced standards, but will need to earn additional points in order to achieve certification.

“This change is significant both in that it will no doubt increase first costs of most LEED projects when those projects will have to satisfy increased minimum energy performance thresholds,” according to a report in Green Building Law Update. Under the new requirements, buildings must demonstrate an 18% improvement in the proposed building performance rating for new buildings, or a 14% improvement in the proposed building performance rating for major renovations to existing buildings. The previous requirements were 10% for new construction and 5% for major renovations.

The change will apply to LEED 2009 projects registering between April 8, 2016 and October 31, 2016—the last day to register a project under LEED 2009.

Related Stories

| Feb 9, 2012

Webinar focuses on lessons learned from LEED-certified industrial project

A Construction Specifications Institute webinar will focus on the lessons learned through the design and construction of a LEED-certified industrial project, Better Living Mill Shop, the first industrial building in Central Virginia to earn LEED certification.

| Feb 8, 2012

California likely to eliminate redevelopment agencies

Leaders of California cities had been trying to fashion a compromise with lawmakers after the state Supreme Court ruled the state had the authority to eliminate the agencies and use their property tax money for local services.

| Feb 8, 2012

Project aimed at economical seismic retrofits on historic Memphis structures

The group will develop a low-cost seismic retrofit model that would benefit aging brick-and-mortar structures. It involves bolting steel brackets to existing wooden floor and ceiling joists.

| Feb 8, 2012

Houston signs on to Better Buildings Challenge

The challenge has about $4 billion in federal and private-sector funds, which it will use for building energy upgrades nationwide in the next two years.

| Feb 8, 2012

OSHA offers free health and safety consulting for small businesses

The consultants offer confidential, non-punitive advice.

| Feb 8, 2012

Controversy over pay for prisoners on roofing job in Michigan

The disagreement was over whether the prisoners should have been paid prevailing wage for their brief time on the job because the project was paid for with a U.S. Department of Energy grant.

| Jan 30, 2012

ZigBee and ISO 50001: Two new standards to make buildings greener

These developments demonstrate the dynamic nature of the market and the continued need for development of program standards of many different types that help builders and owners translate high performance and sustainable buildings goals into practical measures on the ground.

| Jan 30, 2012

New firm-fixed-price rules on federal contracts impact construction industry

Contractors will need to be on the lookout for policies such as the Contractor Accountability for Quality clause.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021