flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New, larger Statue of Liberty Museum being built on Liberty Island

Museums

New, larger Statue of Liberty Museum being built on Liberty Island

The museum will look to complement the Statue of Liberty without drawing attention away from it


By David Malone, Associate Editor | October 10, 2016

Courtesy of Phelps Construction Group

Liberty Island, the home of the Statue of Liberty in New York Harbor, is about to receive a new 26,000-sf Statue of Liberty Museum. The museum will provide guests to the tiny island an alternative experience if they are not one of the lucky few to actually get inside the statue.

The $70 million museum is being designed by FXFOWLE and will be built by Phelps Construction Group. Phelps has worked closely with FXFOWLE in order to determine the most efficient way to construct the sustainable building.

The first floor of the new museum will be built above the 500-year flood level and will have the ability to withstand hurricane force winds. Part of the roof will be planted with vegetation native to the area while the rest will be used as a viewing platform flanked on one side by Lady Liberty and on the other by the Manhattan skyline.

The interior of the museum will feature exhibits and interactive displays providing information about the Statue of Liberty’s history, influence, and legacy. ESI Design will create the exhibits, which will include a theater, an engagement gallery, and an inspiration gallery. One of the largest pieces on display in the museum will be the Statue of Liberty’s original torch, which was replaced during a renovation of the statue in the 1980s. The torch will be displayed in a glass-walled space allowing visitors to view the old torch and its replacement at the same time, according to The New York Times.

Funding for the museum is being covered by the Statue of Liberty-Ellis Island Foundation, which has already raised about $40 million.

The expected completion date for the new museum is in 2019.

Tags

Related Stories

| Dec 19, 2013

Mastering the art of crowd control and visitor flow in interpretive facilities

To say that visitor facility planning and design is challenging is an understatement. There are many factors that determine the success of a facility. Unfortunately, visitor flow, the way people move and how the facility accommodates those movements, isn’t always specifically considered.

| Dec 13, 2013

Safe and sound: 10 solutions for fire and life safety

From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies. 

| Dec 10, 2013

16 great solutions for architects, engineers, and contractors

From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.

| Nov 27, 2013

BIG's 'oil and vinegar' design wins competition for the Museum of the Human Body [slideshow]

The winning submission by Bjarke Ingels Group (BIG) and A+ Architecture mixes urban pavement and parkland in a flowing, organic plan, like oil and vinegar, explains Bjarke Ingels. 

| Nov 27, 2013

Wonder walls: 13 choices for the building envelope

BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina. 

| Nov 26, 2013

Construction costs rise for 22nd straight month in November

Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.

| Nov 25, 2013

Building Teams need to help owners avoid 'operational stray'

"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.

| Nov 19, 2013

Top 10 green building products for 2014

Assa Abloy's power-over-ethernet access-control locks and Schüco's retrofit façade system are among the products to make BuildingGreen Inc.'s annual Top-10 Green Building Products list. 

| Nov 13, 2013

Installed capacity of geothermal heat pumps to grow by 150% by 2020, says study

The worldwide installed capacity of GHP systems will reach 127.4 gigawatts-thermal over the next seven years, growth of nearly 150%, according to a recent report from Navigant Research.

| Nov 13, 2013

First look: Renzo Piano's addition to Louis Kahn's Kimbell Art Museum [slideshow]

The $135 million, 101,130-sf colonnaded pavilion by the famed architect opens later this month. 

boombox1
boombox2
native1

More In Category

Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021