flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New K-12 STEM center hosts robotics learning, competitions in Houston suburb

K-12 Schools

New K-12 STEM center hosts robotics learning, competitions in Houston suburb

An unused storage building transformed into lively space for students to immerse in STEM subjects


By Peter Fabris, Contributing Editor | August 8, 2024
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects

A new K-12 STEM center in a Houston suburb is the venue for robotics learning and competitions along with education about other STEM subjects. An unused storage building was transformed into a lively K-12 school space for students to immerse themselves in STEM subjects.

Located in Texas City, the ISD Marathon STEM and Robotics Center is the first of its kind in the district. Designed and built by Pfluger Architects and Bartlett Cocke, the facility is accessible to all students in the district. It includes an open, flexible arena to host robotics competitions and a control room for students to manage cameras and audio during tournaments. The facility also includes a fabrication lab for metal and woodworking, classrooms for advanced engineering courses, and a maker space for elementary students to explore STEM subjects.

Large bay windows and overhead and sliding doors flood the spaces with natural light and create an inviting, open atmosphere. Each design element and material used throughout the space is thoughtfully crafted to support students’ curiosity and growth.

A partnership with Marathon Petroleum Corporation helped the district offset the cost of equipping the facility, creating a bridge between career and technical education and lucrative jobs in the industry. Marathon contributed $1 million to the project.

The facility has already hosted several competitions for the district’s award-winning robotics team and is hosting robotics camps for pre-K through 6th grade students this summer to expose young people to exciting STEM careers.

On the project team:
Owner and/or developer: Texas City Independent School District
Design architect: Pfluger Architects
Architect of record: Pfluger Architects
MEP engineer: DBR
Structural engineer: CSF Consulting
General contractor/construction manager: Bartlett Cocke

ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects
ISD Marathon STEM and Robotics Center, Photo courtesy Pfluger Architects
Photo courtesy Pfluger Architects

 

Related Stories

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 24, 2012

Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion

The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.

| May 21, 2012

Winchester High School receives NuRoof system

Metal Roof Consultants attended a school board meeting and presented a sloped metal retrofit roof as an alternative to tearing off the existing roof and replacing it with another flat roof.

| May 8, 2012

Gensler & J.C. Anderson team for pro bono high school project in Chicago

City Year representatives came to Gensler for their assistance in the transformation of the organization’s offices within Orr Academy High School, which also serve as an academic and social gathering space for students and corps members.

| Mar 5, 2012

Perkins Eastman pegs O’Donnell to lead K-12 practice

O’Donnell will continue the leadership and tradition of creative design established by firm Chairman and CEO Bradford Perkins FAIA, MRAIC, AICP in leading this market sector across the firm’s 13 offices domestically and internationally.

| Dec 27, 2011

USGBC’s Center for Green Schools releases Best of Green Schools 2011

Recipient schools and regions from across the nation - from K-12 to higher education - were recognized for a variety of sustainable, cost-cutting measures, including energy conservation, record numbers of LEED certified buildings and collaborative platforms and policies to green U.S. school infrastructure.

| Dec 5, 2011

RJM Construction begins building Nova Classical Academy in St. Paul

As the general contractor, RJM is constructing the 94,000-sf building that will consolidate the St. Paul school’s two other locations. 

| Sep 23, 2011

Under 40 Leadership Summit

Building Design+Construction’s Under 40 Leadership Summit takes place October 26-28, 2011 Hotel at the Monteleone in New Orleans. Discounted hotel rate deadline: October 2, 2011.  

| Sep 12, 2011

LACCD’s $6 billion BIM connection

 The Los Angeles Community College District requires every design-build team in its massive modernization program to use BIM, but what they do with their 3D data after construction is completed may be the most important change to business as usual.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021