flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Jersey data centers will manage loads with pods

New Jersey data centers will manage loads with pods

The two data center facilities totaling almost 430,000 sf for owner Digital Realty Trust will use the company's TK-Flex planning module, allowing for 24 pods.


By BD+C Staff | May 26, 2014

Highland Associates is providing architectural/engineering design services for two data center facilities totaling almost 430,000 sf in Totowa, N.J., for owner Digital Realty Trust.

The design uses the owner’s TK-Flex planning module, allowing for 24 pods. Rooftop units will provide cooling for IT equipment loads as well as exterior heat loads and heat gain from people, lighting, and power distribution units in the space. 

Air-side economizers will be used to increase system efficiency and reduce energy usage. Sight lines, noise, and security have been designed with sensitivity to surrounding residential areas. A new 69 kV substation will feed the two new buildings. 

Also on the Building Team: The Ardent Company (owner’s project manager/representative), RRC Engineering (SE), VHB (CE), DPR Construction (preconstruction services), Turner Construction (preconstruction services), and Guidepost Solutions (site and building security).

Related Stories

Architects | Jan 23, 2017

Why corporate branded environments matter

A branded environment has the potential to create a long-lasting impression for your intended audiences.

Architects | Jan 19, 2017

Harley Ellis Devereaux merges with Deems Lewis McKinley

The combination is expected to bolster HED’s presence in northern California and the K-12 sector.

Architects | Jan 13, 2017

Best in Architecture: 23 projects win AIA 2017 Institute Honor Awards

The Shigeru Ban-designed Aspen Art Museum and the General Motors Design Auditorium by SmithGroupJJR are among the architecture, interior architecture, and urban design projects to win. 

Designers | Jan 13, 2017

The mind’s eye: Five thoughts on cognitive neuroscience and designing spaces

Measuring how the human mind responds to buildings could improve design.

Building Materials | Jan 9, 2017

Architects and researchers are developing new techniques for building in space

As setting foot on Mars becomes a more realistic goal, the search for how to best develop Architecture for the Red Planet is heating up.

Architects | Jan 5, 2017

U.S. architects can now earn licenses to practice Down Under

NCARB finalizes reciprocal agreement with Australia and New Zealand.

Architects | Jan 4, 2017

The making of visible experts: A path for seller-doers in the AEC industry

Exceptional seller-doers have the ability to ask the right questions, and more importantly, listen.

Building Team | Jan 3, 2017

How does your firm’s hit rate stack up to the AEC competition?

If your firm is not converting at least a third of project proposals when competing for new work, it may be time to reassess your marketing tactics and processes.

Architects | Dec 9, 2016

Leddy Maytum Stacy Architects receives the 2017 AIA Architecture Firm Award

LMSA is the 54th AIA Architecture Firm Award recipient.

| Dec 8, 2016

Paul Revere Williams, FAIA, awarded 2017 AIA Gold Medal

The Gold Medal honors an individual whose significant body of work has had a lasting influence on the theory and practice of architecture.

boombox1
boombox2
native1

More In Category



Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021