flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New iPad app ready for prime time

New iPad app ready for prime time

Siemens’ versatile application connects users to APOGEE BAS control and monitoring functions via wireless network connectivity. The application directly interacts with BACnet/IP and Siemens APOGEE P2 field panels. 


By By BD+C Staff | January 24, 2012
Users can develop their own customized interface graphics using Facility Prime Editor or, if desired, have their local Siemens r

Siemens Building Technologies Division announced today the launch of its Facility Prime native Apple iOS application for the APOGEE Building Automation System (BAS). Through customized screens, Facility Prime enables fast, convenient, mobile interaction with a multitude of facility conditions. 

Facility Prime goes beyond accessing data and provides two-way interaction between users and the building automation systems they manage. Siemens’ versatile application connects users to APOGEE BAS control and monitoring functions via wireless network connectivity. The application directly interacts with BACnet/IP and Siemens APOGEE P2 field panels. 

Users can develop their own customized interface graphics using Facility Prime Editor or, if desired, have their local Siemens representative create a dynamic interface to suit their facility management needs. After accessing the network, users can view environmental conditions via this custom-tailored interface. Users can also connect to their facility’s BAS via the enterprise’s virtual private network if available. After proper access credentials are authenticated, users can command points and equipment.  Commands made from Facility Prime are logged in the APOGEE Insight System Activity Log.

Facility Prime delivers a variety of convenient, but powerful facility systems management features to the dynamic iPad platform including: 

  • The “Graphics” view, which allows Facility Prime users to monitor in real-time building environmental conditions and HVAC equipment;
  • A “Report” function that captures current conditions and either saves the GUI image as a file or embeds it in an email;
  • A patent-pending “Scan” function which opens a scanning feature employing Quick Response (QR) barcodes to trigger actions such as navigating to graphics;
  • A “List” view providing a quick, non-graphical status check of important data points with Green / Red color bar status;
  • A “Charts” function that provides key static or dynamic graphs for analysis of facility data, and
  • A “Tools” view providing Editor function users the ability to browse and command selected facility data objects.

Facility Prime becomes available in February. BD+C

Related Stories

| Oct 14, 2011

University of New Mexico Science & Math Learning Center attains LEED for Schools Gold

Van H. Gilbert architects enhances sustainability credentials.

| Oct 14, 2011

BD+C Survey on Building Information Modeling: The Good, the Bad, and the Solutions

In a recent survey conducted by Building Design+Construction, more than 75% of respondents indicated they currently use BIM or plan to use it. Respondents were also asked to comment on their experiences with BIM, what they liked and disliked about BIM, and what BIM-related advice they would give to their peers. 

| Oct 14, 2011

ACI partners with CRSI to launch new adhesive anchor certification program

Adhesive anchor installer certification required in new ACI 318-11.

| Oct 14, 2011

Midwest construction firms merge as Black and Dew

  Merger is aimed at increasing market sector capabilities and building on communication and core contracting competencies.

| Oct 14, 2011

AIA Continuing Education: optimizing moisture protection and air barrier systems

Earn 1.0 AIA/CES learning units by studying this article and passing the online exam.

| Oct 12, 2011

BIM Clarification and Codification in a Louisiana Sports Museum

The Louisiana State Sports Hall of Fame celebrates the sporting past, but it took innovative 3D planning and coordination of the future to deliver its contemporary design.

| Oct 12, 2011

Vertical Transportation Systems Reach New Heights

Elevators and escalators have been re-engineered to help building owners reduce energy consumption and move people more efficiently. 

| Oct 12, 2011

Building a Double Wall

An aged federal building gets wrapped in a new double wall glass skin.

Office Buildings | Oct 12, 2011

8 Must-know Trends in Office Fitouts

Office designs are adjusting to dramatic changes in employee work habits. Goodbye, cube farm. Hello, bright, open offices with plenty of collaborative space.

| Oct 12, 2011

FMI’s Construction Outlook: Third Quarter 2011 Report

  Construction Market Forecast: The general economy is seeing mixed signs.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021