flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New iPad app ready for prime time

New iPad app ready for prime time

Siemens’ versatile application connects users to APOGEE BAS control and monitoring functions via wireless network connectivity. The application directly interacts with BACnet/IP and Siemens APOGEE P2 field panels. 


By By BD+C Staff | January 24, 2012
Users can develop their own customized interface graphics using Facility Prime Editor or, if desired, have their local Siemens r

Siemens Building Technologies Division announced today the launch of its Facility Prime native Apple iOS application for the APOGEE Building Automation System (BAS). Through customized screens, Facility Prime enables fast, convenient, mobile interaction with a multitude of facility conditions. 

Facility Prime goes beyond accessing data and provides two-way interaction between users and the building automation systems they manage. Siemens’ versatile application connects users to APOGEE BAS control and monitoring functions via wireless network connectivity. The application directly interacts with BACnet/IP and Siemens APOGEE P2 field panels. 

Users can develop their own customized interface graphics using Facility Prime Editor or, if desired, have their local Siemens representative create a dynamic interface to suit their facility management needs. After accessing the network, users can view environmental conditions via this custom-tailored interface. Users can also connect to their facility’s BAS via the enterprise’s virtual private network if available. After proper access credentials are authenticated, users can command points and equipment.  Commands made from Facility Prime are logged in the APOGEE Insight System Activity Log.

Facility Prime delivers a variety of convenient, but powerful facility systems management features to the dynamic iPad platform including: 

  • The “Graphics” view, which allows Facility Prime users to monitor in real-time building environmental conditions and HVAC equipment;
  • A “Report” function that captures current conditions and either saves the GUI image as a file or embeds it in an email;
  • A patent-pending “Scan” function which opens a scanning feature employing Quick Response (QR) barcodes to trigger actions such as navigating to graphics;
  • A “List” view providing a quick, non-graphical status check of important data points with Green / Red color bar status;
  • A “Charts” function that provides key static or dynamic graphs for analysis of facility data, and
  • A “Tools” view providing Editor function users the ability to browse and command selected facility data objects.

Facility Prime becomes available in February. BD+C

Related Stories

Green | Apr 22, 2015

GSA's Federal Center South Building honored with AIA Top Ten Plus Award for 'verified' sustainable performance

The annual award recognizes green building projects that have quantifiable metrics demonstrating the performance and positive impact of the sustainable design.

Architects | Apr 21, 2015

Megatrends shaping commercial building design

Gensler’s 2015 Design Forecast focuses on how changes in demographics, workplace preferences, and technology are affecting how and why structures get built.

Office Buildings | Apr 21, 2015

Stop the endless debate over open vs. closed work environments

Rather than be confused by the constant stream of opinions, leadership teams contemplating workplace investments should start with powerful employee engagement strategies that drive results.

BIM and Information Technology | Apr 21, 2015

Software tools shouldn't dictate the AEC process

With over 200 solutions on the market, construction software is one of the most complex and fragmented markets, writes Gensler's Mark Thole.

Cultural Facilities | Apr 20, 2015

Jean Nouvel loses court battle against Philharmonie de Paris over alleged design ‘sabotage’

Nouvel boycotted the January opening of the facility and asked for his name to be removed from all references to the work. 

Contractors | Apr 20, 2015

Too many construction projects don’t meet owners’ expectations: KPMG report

Causes for delays, overruns, and underperformance include project management talent shortages, distrust between owners and contractors, and the lack of fully integrated project management systems.     

High-rise Construction | Apr 17, 2015

Construction begins on Goettsch Partners-designed Nanning China Resources Center Tower

The tower's design is derived from its multiple uses, which include 170,000 sm of Class A office space, 5,000 sm of boutique retail, and a 45,000-sm luxury Shangri-La hotel.

Museums | Apr 16, 2015

SANAA and Snøhetta tie at first place for Budapest museum bid

The two firms submitted designs for the New National Gallery and Ludwig Museum, one of five planned museums to be constructed in a park just outside the urban center of Hungary’s capital. 

High-rise Construction | Apr 16, 2015

Construction begins on Seattle's Tibet-inspired Potala Tower

Construction on the 41-story Potala Tower in Seattle finally kicked off following a ground-breaking ceremony seven months ago.

Architects | Apr 14, 2015

Jeanne Gang, Bjarke Ingels among participants for inaugural Chicago Architecture Biennial

Some big names include Bjarke Ingels Group and Studio Gang Architects

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021