flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New immigration bill protects the legal status of more than 100,000 people in Dreamers and TPS programs who work in construction

Contractors

New immigration bill protects the legal status of more than 100,000 people in Dreamers and TPS programs who work in construction

Offering undocumented immigrants a path to legal status will put an end to unfair competition and labor exploitation, but bill fails to create a construction worker visa program, has other flaws.


By AGC | February 19, 2021

Courtesy Pixabay

The Associated General Contractors of America’s chief executive officer, Stephen E. Sandherr, issued the following statement in reaction to the introduction in Congress today of the U.S. Citizenship Act of 2021:

“The proposed new immigration bill provides long-needed reforms to the nation’s flawed approach to immigration. By proposing to protect the legal status of so-called “Dreamers” and immigrants participating in the Temporary Protected Status program, the measure will allow more than 100,000 people to continue working lawfully in the construction industry. In addition, the bill’s efforts to provide a path to legal status for undocumented immigrants will, if enacted, help eliminate the exploitation of undocumented workers by unscrupulous employers that puts our member firms at an unfair competitive disadvantage.

“However, the bill’s lack of a year-round, work visa program for construction workers makes it likely that many more will seek to enter the country unlawfully, especially in times of strong economic growth. The measure’s whistle blower provisions create perverse incentives for undocumented workers to make unsubstantiated workplace allegations simply to secure protected status within the domestic workforce.

“Moving forward, we will work with Congress to address the bill’s significant flaws as we work to protect or provide legal status for many who currently work in the construction community so they can continue to support economic growth and development.”

Related Stories

| Dec 9, 2012

BIM becomes VDC

A case study in disruption.

| Dec 9, 2012

Greenzone pop quiz

Greenbuild attendees share their thoughts with BD+C on the SAGE modular classroom.

| Dec 9, 2012

Modular classroom building makes the grade

SAGE modular classroom opens eyes, minds at Greenbuild 2012.

| Dec 9, 2012

14 great solutions

Welcome to the third installment of Building Design+Construction’s “Great Solutions,” highlighting 14 innovative technologies and products that you can put to work in your next project.

| Dec 9, 2012

D’ambrosio joins BD+C’s editorial board

D’Ambrosio, a 2009 selection to the magazine’s “40 Under 40” galaxy of AEC superstars, holds a bachelor’s in architectural engineering from the Pennsylvania State University.

| Dec 9, 2012

AEC professionals cautiously optimistic about commercial construction in ’13

Most economists say the U.S. is slowly emerging from the Great Recession, a view that was confirmed to some extent by an exclusive survey of 498 BD+C subscribers whose views we sought on the commercial construction industry’s outlook on business prospects for 2013.

| Dec 6, 2012

Suffolk Construction awarded Phase Two of Boston’s Old Colony redevelopment project

Project team breaks ground on South Boston public housing project designed for energy efficiency.

| Dec 5, 2012

Gilbane publishes Winter 2012 construction economic report

Report outlines impact of recent events; predicts continued movement, while slow, toward recovery.

| Dec 5, 2012

Bernards selected to build new Merced, Calif. high school campus

Designed by BCA Architects, the $76 million, 220,000-ft project encompasses a total of nine buildings.

boombox1
boombox2
native1

More In Category

Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.



Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021