flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New hotel and residential tower coming to San Francisco’s Transbay neighborhood

Mixed-Use

New hotel and residential tower coming to San Francisco’s Transbay neighborhood

The ground-up development will feature 255 hotel rooms and 69 residential units.


By David Malone, Associate Editor | March 1, 2017

Rendering courtesy of Steelblue.

555 Howard, a ground-up mixed-use tower, is looking to bring an additional 69 rental units and a 255-room hotel to San Francisco’s Transbay neighborhood.

The glass curtain-walled tower will offer residents and guests ballroom facilities, a spa and fitness center, a ground floor restaurant, a 1,763-sf public sky bar on the 36th floor, and a 5,047-sf public rooftop terrace. Guests will be welcomed into the building by a three-story lobby atrium.

The hotel will occupy approximately 206,562 sf across floors 1 through19 and B1 through B3. The residential units will occupy approximately 150,275 sf on floors 1 (residential lobby) and 20 through 36. On the 21st floor, the curtain wall steps back to create an outdoor terrace for building residents.

Four proposed underground levels will include 70 parking spaces and 95 Class I bicycle parking spaces. An additional 25 Class II bicycle spaces will be located along the Howard Street sidewalk.

Across all floors, 555 Howard offers 358,600 sf of GSF.

A reinforced mat foundation, eight feet thick at the northwest and southeast sides of the tower and 12 feet thick at the tower core, was recommended upon investigation of the build site. Plenty of attention will be given to the building’s foundation to avoid a similar outcome as Millennium Tower, the San Francisco tower that has become infamous for its flawed foundation work.

555 Howard was designed to meet LEED Platinum requirements. The project is expected to take three years to complete from groundbreaking and is being developed by Pacific Eagle and designed by Renzo Piano Building Workshop.

 

Rendering courtesy of Steelblue.

 

Rendering courtesy of Steelblue.

 

Rendering courtesy of Steelblue.

 

Rendering courtesy of Steelblue.

Related Stories

| Aug 11, 2010

Gold Award: Westin Book Cadillac Hotel & Condominiums Detroit, Mich.

“From eyesore to icon.” That's how Reconstruction Awards judge K. Nam Shiu so concisely described the restoration effort that turned the decimated Book Cadillac Hotel into a modern hotel and condo development. The tallest hotel in the world when it opened in 1924, the 32-story Renaissance Revival structure was revered as a jewel in the then-bustling Motor City.

| Aug 11, 2010

Silver Award: Palmer House Hilton Hotel & Shops Chicago, Ill.

Chicago's Palmer House Hilton holds the record for the longest continuously operated hotel in North America. It was originally built in 1871 by Potter Palmer, one of America's first millionaire developers. When it was rebuilt after the Great Chicago Fire it became the first hotel in the U.S. to put a telephone in every room.

| Aug 11, 2010

Gulf Coast Hotel's Stormy Road to Recovery

After his initial tour of the dilapidated 1850s-era Battle House Hotel, Ron Blount, construction manager with Retirement Systems of Alabama, said to his boss: “You need a priest more than you need a contractor.” Those words were more prescient to RSA's restoration of the historic Mobile landmark than he could have known at the time.

| Aug 11, 2010

Lifestyle Hotel Trends Around the World

When the Rocco Forte Collection opens the Verdura Golf & Spa Resort in Sicily in early 2009, the 200-room luxury property will be one of the world's newest lifestyle hotels. Lifestyle hotels cater to guests seeking a heightened travel experience, which they deliver by offering distinctive—some would say avant-garde, or even outrageous—architecture, room design, amenities, and en...

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021