555 Howard, a ground-up mixed-use tower, is looking to bring an additional 69 rental units and a 255-room hotel to San Francisco’s Transbay neighborhood.
The glass curtain-walled tower will offer residents and guests ballroom facilities, a spa and fitness center, a ground floor restaurant, a 1,763-sf public sky bar on the 36th floor, and a 5,047-sf public rooftop terrace. Guests will be welcomed into the building by a three-story lobby atrium.
The hotel will occupy approximately 206,562 sf across floors 1 through19 and B1 through B3. The residential units will occupy approximately 150,275 sf on floors 1 (residential lobby) and 20 through 36. On the 21st floor, the curtain wall steps back to create an outdoor terrace for building residents.
Four proposed underground levels will include 70 parking spaces and 95 Class I bicycle parking spaces. An additional 25 Class II bicycle spaces will be located along the Howard Street sidewalk.
Across all floors, 555 Howard offers 358,600 sf of GSF.
A reinforced mat foundation, eight feet thick at the northwest and southeast sides of the tower and 12 feet thick at the tower core, was recommended upon investigation of the build site. Plenty of attention will be given to the building’s foundation to avoid a similar outcome as Millennium Tower, the San Francisco tower that has become infamous for its flawed foundation work.
555 Howard was designed to meet LEED Platinum requirements. The project is expected to take three years to complete from groundbreaking and is being developed by Pacific Eagle and designed by Renzo Piano Building Workshop.
Rendering courtesy of Steelblue.
Rendering courtesy of Steelblue.
Rendering courtesy of Steelblue.
Rendering courtesy of Steelblue.
Related Stories
| Sep 1, 2016
HOTEL SECTOR GIANTS: A ranking of the nation's top hotel sector design and construction firms
Gensler, HKS, Turner Construction Co., The Whiting-Turner Contracting Co., Jacobs, and JBA Consulting Engineers top Building Design+Construction’s annual ranking of the nation’s largest hotel sector AEC firms, as reported in the 2016 Giants 300 Report.
Hotel Facilities | Aug 29, 2016
Artificial rainforest coming to Dubai hotel courtesy of ZAS Architects
The faux-rainforest will be located at The Rosemont Hotel & Residences Dubai.
Hotel Facilities | Aug 17, 2016
First of its kind tri-branded Marriott hotel under construction in downtown Nashville
The hotel will combine the AC Hotels, Residence Inn, and SpringHill Suites brands.
Hotel Facilities | Aug 17, 2016
Hotel construction continues to flourish in major cities
But concerns about overbuilding persist.
Designers | Aug 16, 2016
CCDI, Morphosis, and Diller Scofidio + Renfro are among ten finalists vying for Chinese Eco-Island design
The winning firm will design the master plan and central buildings for the man made Haikou Bay island.
Mixed-Use | Aug 16, 2016
Goettsch Partners completes mixed-use tower in R&F Yingkai Square
The 66-story building is now the 7th tallest completed building in Guangzhou.
Hotel Facilities | Aug 2, 2016
The dot-com generation: How Millennials are influencing hospitality
Millennials’ desire for authentic experiences has been the catalyst for a refresh of most brand standards, writes Gensler's Lisa Kong
Hotel Facilities | Jul 27, 2016
Proven strategies for managing costs and maximizing ROI for any hotel renovation scenario
Paul Brussow, Executive Vice President with Rider Levett Bucknall, offers cost control strategies for hotel renovations projects.
Sports and Recreational Facilities | Jul 20, 2016
San Diego’s waterfront redevelopment would go beyond a mere ‘project’
Its developers envision a thriving business, education, and entertainment district, highlighted by a huge observation tower and aquarium.
High-rise Construction | Jul 15, 2016
Zaha Hadid designs geometric flower-shaped tower for sustainable Qatar city
The 38-story building will have a mashrabiya latticed facade with hotel and residential space inside.