Silver Cross Hospital's recently opened data center puts it at the forefront of an emerging healthcare trend: Combining construction of new hospitals with new data centers to offer the latest in technology and accommodate an explosion in applications and patient data--not just documents, but images and videos.
With the February, 2012 opening of its 600,000-sf, $370 million medical complex with outpatient center, medical service building and hospital, the New Lenox Ill. community hospital needed to update and expand its aging data resources, which were already operating at capacity. With its new 2,450-sf data center, 50% larger than its existing one, patients and staff are already enjoying the benefits of new technology.
Silver Cross became one of the first hospitals to install patient tracking software so families know where a patient is at all times. New communication equipment supports wireless voice and data networks throughout the hospital, providing access to patients and their families while freeing clinicians to use phones and computers where needed instead of based on location. Also, medical telemetry enables remote monitoring of patient vital signs.
Other leaders, including OSF's new Children's Hospital of Illinois in Peoria and the soon-to-open Ann & Robert H. Lurie Children's Hospital of Chicago, have combined new data centers with new medical facilities. Together, they are laying a technology foundation for the emerging era in healthcare that will be dominated by electronic patient records and new care delivery approaches that require real-time coordination and information exchange among multiple providers, payers, patients, and locations.
Given the escalating IT demands, growth of bigger and better healthcare data centers is only likely to strengthen. In a fall, 2011 survey by Mortenson of 90 data center and facilities experts at the 7x24 Exchange Conference, 92% of respondents ranked healthcare as the industry with the greatest need for new data centers in the next five years. +
Related Stories
| Apr 25, 2012
J.C. Anderson selected for 50,000-sf build out at Chicago’s DePaul University
The build-out will consist of the construction of new offices, meeting rooms, video rooms and a state-of-the-art multi-tiered Trading Room.
| Apr 24, 2012
ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014
Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.
| Apr 24, 2012
Roofing Supply Group acquired by Clayton, Dubilier & Rice
RSG provides a complete offering of residential and commercial roofing materials and related supplies.
| Apr 24, 2012
McLennan named Ashoka Fellow
McLennan was recognized for his work on the Living Building Challenge.
| Apr 24, 2012
AECOM design and engineering team realizes NASA vision for Sustainability Base
LEED Platinum facility opens at NASA Ames Research Center at California’s Moffett Field.
| Apr 23, 2012
Vegas’ CityCenter called financial ‘black hole’
Two and a half years ago, stockholders filed six lawsuits after the stock price fell from $99.75 on Oct. 9, 2007, to $1.89 on March 5, 2009. Bondholders sued over similar steep losses.
| Apr 23, 2012
Innovative engineering behind BIG’s Vancouver Tower
Buro Happold’s structural design supports the top-heavy, complex building in a high seismic zone; engineers are using BIM technology to design a concrete structure with post-tensioned walls.
| Apr 23, 2012
AAMA releases updated specification for anodized aluminum
AAMA 611-12 describes test procedures and requirements for high performance (Class I) and commercial (Class II) architectural quality aluminum oxide coatings applied to aluminum extrusions and panels for architectural products.
| Apr 23, 2012
Thornton Tomasetti project wins AISC Merit Award
Thornton Tomasetti provided structural design services through construction administration to architect HOK for the 1.6-million-sf tower and tiara structure, which comprises 15 steel tube arches spanning approximately 158 feet horizontally and 130 feet vertically from the top of the main building roof.