Shawmut Design and Construction, in partnership with Arrowstreet, NV5, and the Massachusetts School Building Authority, has broken ground on the new Hildreth Elementary School in Harvard, Mass.
The 85,200-sf school will accommodate 445 PK-5 students. The facility will include 25 core classrooms, a media center, an open-styled lobby, a cafeteria, a gymnasium, an art room, superintendent and administrative support staff offices, a state-of-the-art STEM center, and flexible learning spaces.
Built in two phases, the first phase of construction will include the ground-up construction of the building adjacent to the existing building, while the second phase will begin with the demolition of the existing school and include outdoor site enhancements. Outdoor enhancements include two playgrounds, a sports field, an updated bus drop-off lane, clearer pick-up/drop-off zones, and 96 designated parking spaces. Stormwater mitigation measures and rooftop solar panels will also be included.
See Also: Covenant House New York will support the city’s homeless youth
The school is scheduled for completion in 2021.
Related Stories
| Nov 18, 2014
New tool helps developers, contractors identify geographic risk for construction
The new interactive tool from Aon Risk Solutions provides real-time updates pertaining to the risk climate of municipalities across the U.S.
| Nov 14, 2014
What college students want in their living spaces
In a recent workshop with 62 college students, architects from Little explored the changing habits and preferences of today's students, and how those changes affect their living spaces.
| Nov 12, 2014
Chesapeake Bay Foundation completes uber-green Brock Environmental Center, targets Living Building certification
More than a decade after opening its groundbreaking Philip Merrill Environmental Center, the group is back at it with a structure designed to be net-zero water, net-zero energy, and net-zero waste.
| Nov 7, 2014
NORD Architects releases renderings for Marine Education Center in Sweden
The education center will be set in a landscape that includes small ponds and plantings intended to mimic an assortment of marine ecologies and create “an engaging learning landscape” for visitors to experience nature hands-on.
| Nov 6, 2014
Studio Gang Architects will convert power plant into college recreation center
The century-old power plant will be converted into a recreation facility with a coffee shop, lounges, club rooms, a conference center, lecture hall, and theater, according to designboom.
| Oct 29, 2014
Newtown, Conn., breaks ground on new Sandy Hook Elementary School
Construction on the 87,000-square-foot building will begin in March 2015, and is set to open for the fall 2016 school year. The property is fenced off so that the site cannot be seen or photographed from the outside.
| Oct 26, 2014
Study asks: Do green schools improve student performance?
A study by DLR Group and Colorado State University attempts to quantify the student performance benefits of green schools.
| Oct 21, 2014
Check out BD+C's GreenZone Environment Education Classroom debuting this week at Greenbuild
At the conclusion of the show, the modular classroom structure will be moved to a permanent location in New Orleans' Lower 9th Ward, where it will serve as a community center and K-12 classroom.
| Oct 20, 2014
Institute for young innovators breaks ground at the University of Utah
The five-story, 148,000-sf building is designed to function like a student union for entrepreneurs and innovators, with a 20,000-sf “garage” that will be open for any student to attend events, build prototypes, and launch companies.