Owatonna Public Schools in Minnesota recently completed the $99 million, 317,000-sf Owatonna High School for Independent School District 761.
The school, which accommodates 1,600 students, has classroom and lab spaces supporting career pathways toward nursing, culinary arts, digital fabrication, science and engineering, publishing and digital content creation. Students can earn certificates, college credits, and career credentials, said Jeff Elstad, superintendent of Owatonna Publics Schools.
The project’s Building Team was led by Wold Architects & Engineers and the construction manager Kraus-Anderson. Federated Insurance, which is headquartered in Owatonna, donated $20 million plus the land for the new high school. Other private donors, contributing more than $4 million, included Mayo Clinic Health System, Viracon, Wenger Corporation and Wenger Foundation (Wenger’s name is on the school’s performing arts center), Gopher Sport, Life Fitness/Cybex, Owatonna Foundation, and 761 Foundation.
St. Paul-based Wold had been attached to this project for nearly a decade. “We are excited to see how this school realizes the district’s vision for education for many years to come, and becomes a role model for the area in high school education,” said Paul Aplikowski, a Partner at Wold, in a prepared statement.
School offers a sense of home
![Career path learning spaces in Owatonna HIgh School](/sites/default/files/inline-images/Owatonna%20High%20School_Photo%203_Taken%20by%20Troy%20Thies.jpg)
This school construction is part of a $112 million district bond referendum, which voters passed in November 2019. Construction began in May 2021 and was completed last August. The new building combines structural steel and precast concrete, with an exterior facade comprised of brick and metal panels along with a substantial amount of glazing to bring abundant natural light into the building.
The main curtain wall at the entrance to the building is 66 ft wide by 31 ft tall. Interior finishes include terrazzo flooring throughout the commons and fitness areas, prefinished interior panels in the auditorium, and numerous locations of tile, hardwood panels and metal panels covering the walls and column wraps.
The three-story school on 90 acres features a commons area that, according to Wold, evokes a town square. The classrooms are designed to provide a sense of home and place.
![Gymnasium at Owatonna High School](/sites/default/files/inline-images/Owatonna%20High%20School_Photo%204_Taken%20by%20Troy%20Thies.jpg)
The campus includes a 3,451-seat football stadium, two multipurpose athletic fields and two grass fields, eight tennis courts, two softball fields, two baseball fields, a gymnasium, and an 825-seat auditorium. The campus also has four storage buildings for athletics, and 890 parking spaces.
“Owatonna Public Schools has been a fantastic partner during the entire construction process, where close communication and coordination was needed to meet all expectations,” said Michael Stenbeck, Kraus-Anderson’s project manager, in a prepared statement. “It has been amazing to witness jaws drop as students and the community walk into the new facility.”
Related Stories
Industry Research | Feb 22, 2016
8 of the most interesting trends from Gensler’s Design Forecast 2016
Technology is running wild in Gensler’s 2016 forecast, as things like virtual reality, "smart" buildings and products, and fully connected online and offline worlds are making their presence felt throughout many of the future's top trends.
K-12 Schools | Feb 4, 2016
Grimshaw and BVN design 14-story public school in Australia
The design of the high-rise is based on the template of Schools-within-Schools (SWIS), a system that de-emphasizes age groups.
| Jan 14, 2016
How to succeed with EIFS: exterior insulation and finish systems
This AIA CES Discovery course discusses the six elements of an EIFS wall assembly; common EIFS failures and how to prevent them; and EIFS and sustainability.
K-12 Schools | Nov 10, 2015
New York City opens SOM-designed net-zero school
The Kathleen Grimm School for Leadership and Sustainability at Sandy Ground will produce 662,500 kWh of energy, which will offset the amount of energy it consumes.
Designers | Sep 21, 2015
Can STEAM power the disruptive change needed in education?
Companies need entrepreneurial and creative workers that possess critical thinking skills that allow them to function in collaborative teams. STEAM (science, technology, engineering, arts, and mathematics) education might be the solution.
Giants 400 | Aug 7, 2015
K-12 SCHOOL SECTOR GIANTS: To succeed, school design must replicate real-world environments
Whether new or reconstructed, schools must meet new demands that emanate from the real world and rapidly adapt to different instructional and learning modes, according to BD+C's 2015 Giants 300 report.
Contractors | Jul 29, 2015
Consensus Construction Forecast: Double-digit growth expected for commercial sector in 2015, 2016
Despite the adverse weather conditions that curtailed design and construction activity in the first quarter of the year, the overall construction market has performed extremely well to date, according to AIA's latest Consensus Construction Forecast.
K-12 Schools | Jun 30, 2015
San Diego charter school finds home in existing public library building
The school is located on the sixth and seventh floors of a downtown public library and embraces flexible school days, internship opportunities, and project-based learning.
Codes and Standards | Jun 18, 2015
New document addresses school safety and security
In an effort to balance security and fire safety features within codes, standards and planning, NFPA hosted a two-day workshop, “School Safety, Codes and Security”, last December. The findings are now available in an NFPA report.