Developed for professional insulation contractors, the 36-page guide recommends methods for insulating chilled water piping systems using a vapor-sealed mineral fiber pipe insulation. 


By Peter Fabris, Contributing Editor | July 27, 2015
New guide for installation of mineral fiber pipe insulation on chilled water systems

Photo: Steve Jurvetson, Creative Commons

The North American Insulation Manufacturers Association (NAIMA) has issued a new publication, “Guide to Insulating Chilled Water Piping Systems With Mineral Fiber Pipe Insulation.” 

Developed for professional insulation contractors, the 36-page guide recommends methods for insulating chilled water piping systems using a vapor-sealed mineral fiber pipe insulation.

"Insulation systems are critical to limiting heat losses and preventing condensation on pipe surfaces operating from 33 degrees F to 60 degrees F (0.5 degrees C to 15.6 degrees C) within conditioned spaces in commercial and institutional buildings," says Charles Cottrell, vice president technical services for NAIMA. "When poorly applied, however, an insulation system can compromise insulation effectiveness.” 

“NAIMA developed this step-by-step guide for applying vapor-sealed mineral fiber pipe insulation, which when installed according to the guide's recommendations, can effectively control condensation, help extend the life of the insulation system, and save energy," Cottrell says.

The guide addresses the installation of standard ASJ jacketed pipe insulation and presents recommendations based on reliable engineering principles and research, as well as consultation with manufacturers, contractors, and industry experts.

It details insulation application on straight pipe; on pipe system fittings including flanges, couplings, elbows, tees, and valves; and on 45- and 90-degree elbows.  Also included are details on vapor dams, pipe supports, and field-applied jackets.

Other sections include performance criteria, a guide specification, and installation checklist. Click here to download a free copy of the guide.

Related Stories

| Mar 13, 2014

North Carolina board recommends switch to six-year code update cycle

In a nine to six vote, the North Carolina State Building Code Council on March 11 approved moving the commercial building code (except for the electrical code) to a six-year cycle for updating instead of a three-year cycle.

| Mar 13, 2014

OSHA’s funding disclosure requirement for those offering silica rule comments draws ire

The Occupational Safety and Health Administration is requiring those who submit comments on the silica rule to disclose their funding sources for their scientific research to avoid conflict of interest.

| Mar 13, 2014

EPA publishes ‘best management practices’ rule on erosion, stormwater at construction sites

The Environmental Protection Agency published a new rule this month that will require the construction, housing, and utility sectors to carry out "best management practices" in order to prevent erosion and harmful stormwater discharges at construction sites.

| Mar 5, 2014

San Francisco board seeks remedies to code enforcement complaints

Two supervisors charged that a lack of adequate code enforcement has led to blight from dilapidated or unfinished buildings. 

| Mar 5, 2014

Obama proposes $1 billion for climate change risk mitigation

President Barack Obama would spend $1 billion to “better understand the projected impacts of climate change,” encourage local action to reduce future risk, and fund technology and infrastructure that will be more resilient to climate change.

| Mar 5, 2014

Southern Forest Products Assn. revamps pressure-treated pine specifications

It provides information to assist with the proper specification and use of pressure-treated Southern Pine materials. 

| Mar 5, 2014

UL, PRI Construction Materials Technologies reach product certification agreement

Underwriters Laboratories (UL) Inc. reached an agreement with PRI Construction Materials Technologies LLC (PRI) through which PRI will participate in UL's "Data Acceptance Program," enabling the acceptance of data generated at PRI toward UL product certification.

| Mar 5, 2014

Quebec's building code doesn't meet needs of its aging population

The issue was raised in the wake of a tragic fire at a seniors' residence in L'Isle-Verte. 

| Mar 4, 2014

Massachusetts Congressional delegation asks FEMA to slow flood zone map requirements

After a recent successful challenge of the scientific methodology used to redraw the coastal high-hazard zones, the Massachusetts congressional delegation is asking federal officials to put the brakes on new flood zone maps for the Bay State.

| Mar 3, 2014

Injury-liability law responsible for higher construction insurance cost in New York

Construction contractors and developers in New York state face $3 billion more in costs and 667 more accidents per year because of a state law that holds builders solely liable for such accidents, according to a study commissioned by the New York Civil Justice Institute.

boombox1
boombox2
native1

More In Category


Reconstruction & Renovation

Movement to protect historic buildings raises sharp criticism

While the movement to preserve historic buildings has widespread support, it also has some sharp critics with well-funded opposition groups springing up in recent years. Some opponents are linked to the Stand Together Foundation, founded and bankrolled by the Koch family’s conservative philanthropic organization, according to a column in Governing magazine.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021