flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Frank Gehry project on Sunset Boulevard moves forward with a few compromises

Mixed-Use

New Frank Gehry project on Sunset Boulevard moves forward with a few compromises

Among the compromises, the 8150 Sunset Blvd. project will see its tallest residential tower reduced by 56 feet.


By David Malone, Associate Editor | October 31, 2016

Rendering courtesy of Visualhouse.

A planned mixed-use development from Frank Gehry and located on Sunset Boulevard will be moving forward after the Planning and Land Use Management Committee voted unanimously to approve the plans.

As the Los Angeles Times reports, however, a few compromises were required before the project could move forward. As it stands now, the project consists of two residential towers comprising 229 units (38 of which are for low-income residents), 65,000 sf of commercial space, and a pedestrian plaza. The project arrived at these numbers after the areaā€™s councilman, David Ryu, said he would not support the development unless the 15-story residential tower was downsized, included more affordable housing units, and had additional parking spots added.

All of these conditions were met causing the tower to shrink from 234 feet to 178 feet, the number of parking spots to increase to 494, and the sidewalks to widened to 15 feet.

Even with the compromises, including the smaller size that makes the new tower more in line with the height of surrounding buildings, some neighboring residents are expressing a bout of NIMBYism. They believe the development will still be out of scale with the surrounding area, will ruin their views, and may produce heavy traffic in the area due to all of the new residents. Despite their concerns, the scaled-back project is moving forward.

Tags

Related Stories

| Jun 4, 2013

SOM research project examines viability of timber-framed skyscraper

In a report released today,Ā Skidmore, Owings & MerrillĀ discussed the results of theĀ Timber Tower Research Project: an examination of whether a viable 400-ft, 42-story building could be created with timber framing. The structural type could reduce the carbon footprint of tall buildings by up to 75%.

| Apr 30, 2013

First look: North America's tallest wooden building

The Wood Innovation Design Center (WIDC), Prince George, British Columbia, will exhibit wood as a sustainable building material widely availablearound the globe, and aims to improve the local lumber economy while standing as a testament to new construction possibilities.

| Mar 3, 2013

Hines acquires Archstone's interest in $700 million CityCenterDC project

The Washington D.C. office of Hines, the international real estate firm, announced the acquisition of the ownership interest of their partner, Archstone, in the mixed-use CityCenterDC project that is currently under construction in downtown Washington, D.C.

| Feb 17, 2013

Pakistan to get world's tallest tower in $45 billion deal

Newly signed mega deal will fund construction of several massive developments in Karachi, including a mixed-use tower that will dwarf the Burj Khalifa.

| Jul 12, 2012

EE&K and Knutson Construction selected for the Interchange in Minneapolis

Design-build contract for $79.3 million transportation hub will connect transit with culture.

| Jul 2, 2012

Bernards building mixed-use project in Beverly Hills

The project includes 88 luxury apartment homes atop a 14,000-sf Trader Joeā€™s market and a new coffee shop.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Ā