flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Florida office property is designed for a post-Covid-19 world

Office Buildings

New Florida office property is designed for a post-Covid-19 world

Chesterfield is developing the project.


By David Malone, Associate Editor | October 8, 2020

Lake Mary Corporate Center will be Central Florida’s first office property designed for a post-Covid-19 world.

The Class A office park will offer the flexibility of two to three buildings with entitlements totaling up to 300,000 sf, five parking spots for every 1,000 sf, proximity to both workforce and executive housing, and options for nearby shopping and dining.

Lake Mary Corporate Center features design and technology for a post-Covid-19 world. Features include:

–  A touchless workplace, including touchless access control on doors and elevators, all-touchless bathroom utilities and Bluetooth connectivity to phones;

- HVAC systems with carbon dioxide sensors, increased outdoor airflow, a building purge cycle – which flushes out conditioned air and volatile organic compounds – and an energy recovery system to discourage bacterial growth;

-  construction materials, such as germ-resistant products, radio-frequency identification (RFID) access controls, and occupancy sensors;

- De-densification of workspaces, such as spreading out workstations and setting capacity limits on work areas.

The property is currently available for pre-leasing.

Related Stories

Office Buildings | Jun 24, 2021

Springdale Green office campus granted approval in East Austin

Gensler is designing the project in collaboration with landscape architect dwg.

Office Buildings | Jun 10, 2021

The future of the workplace is social clubs

Office design experts from NELSON Worldwide propose a new concept for the workplace, one that resembles the social clubs of the past. 

Office Buildings | Jun 8, 2021

RMJM Milano wins competition to design Sanko Headquarters in Istanbul, Turkey

The project was selected for its sustainable and innovative features.

Office Buildings | Jun 3, 2021

What's next for workplace design?

Balancing personal space and the need for collaboration.

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

Office Buildings | May 18, 2021

“The Beam” will be Arizona’s first CLT project

RSP Architects designed the building.

Wood | May 14, 2021

What's next for mass timber design?

An architect who has worked on some of the nation's largest and most significant mass timber construction projects shares his thoughts on the latest design trends and innovations in mass timber.

Steel Buildings | Apr 17, 2021

Speed Core wall system is used for the second time in office building in San Jose

The construction method is expected to knock off three months from the project’s schedule.

boombox1
boombox2
native1

More In Category

Office Buildings

Unlocking Sustainability: Smart Access in the Coworking Space

Smart building technologies, including modern access control systems, are transforming coworking spaces by advancing sustainability initiatives and offering new ways to create and operate efficient working spaces. Learn more about the benefits of eco-friendly practices, from reducing carbon emissions to cutting operating costs, and discover 
how choosing the right partners can amplify your green efforts.


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021