Lake Mary Corporate Center will be Central Florida’s first office property designed for a post-Covid-19 world.
The Class A office park will offer the flexibility of two to three buildings with entitlements totaling up to 300,000 sf, five parking spots for every 1,000 sf, proximity to both workforce and executive housing, and options for nearby shopping and dining.
Lake Mary Corporate Center features design and technology for a post-Covid-19 world. Features include:
– A touchless workplace, including touchless access control on doors and elevators, all-touchless bathroom utilities and Bluetooth connectivity to phones;
- HVAC systems with carbon dioxide sensors, increased outdoor airflow, a building purge cycle – which flushes out conditioned air and volatile organic compounds – and an energy recovery system to discourage bacterial growth;
- construction materials, such as germ-resistant products, radio-frequency identification (RFID) access controls, and occupancy sensors;
- De-densification of workspaces, such as spreading out workstations and setting capacity limits on work areas.
The property is currently available for pre-leasing.
Related Stories
| Oct 18, 2011
Dow Building Solutions invests in two research facilities to deliver data to building and construction industry
State-of-the-art monitoring system allows researchers to collect, analyze and process the performance of wall systems.
| Oct 17, 2011
Big D Floor covering supplies to offer Johnsonite Products??
Strategic partnership expands offering to south and west coast customers.
| Oct 17, 2011
Schneider Electric introduces UL924 emergency lighting control devices
The emergency lighting control devices require fewer maintenance costs and testing requirements than backup batteries because they comply with the UL924 standard, reducing installation time.
| Oct 14, 2011
AISC develops new interoperability strategy to move construction industry forward
AISC is working to bring that vision to reality by developing a three-step interoperability strategy to evaluate data exchanges and integrate structural steel information into buildingSMART's Industry Foundation Classes.
| Oct 12, 2011
Vertical Transportation Systems Reach New Heights
Elevators and escalators have been re-engineered to help building owners reduce energy consumption and move people more efficiently.
| Oct 12, 2011
Building a Double Wall
An aged federal building gets wrapped in a new double wall glass skin.
Office Buildings | Oct 12, 2011
8 Must-know Trends in Office Fitouts
Office designs are adjusting to dramatic changes in employee work habits. Goodbye, cube farm. Hello, bright, open offices with plenty of collaborative space.
| Oct 12, 2011
FMI’s Construction Outlook: Third Quarter 2011 Report
Construction Market Forecast: The general economy is seeing mixed signs.
| Oct 11, 2011
Pink light bulbs donated to Society of Memorial Sloan-Kettering Cancer Center
For every Bulbrite Pink Light Bulb that is purchased through the Cancer Center Thrift Shop, 100% of the proceeds will be donated to help support breast cancer research, education, screening, and treatment.
| Oct 11, 2011
ThyssenKrupp elevator cabs validated by UL Environment
The conclusive and independent third-party validation process is another step toward a green product line.