flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New FEMA rules include climate change impacts

Codes and Standards

New FEMA rules include climate change impacts

Expanded floodplains will result in higher-elevated, more resilient buildings


By Peter Fabris, Contributing Editor | July 22, 2024
New FEMA rules include climate change impacts Courtesy FEMA
Courtesy FEMA

FEMA’s new rules governing rebuilding after disasters will take into account the impacts of climate change on future flood risk.

For decades, the agency has followed a 100-year floodplain standard—an area that has a 1% chance of flooding in a given year. The new standard will factor in the impact of climate change such as rising sea level and heavier rainfalls when it funds rebuilding projects.

In coastal areas, the agency will account for increased erosion projected to worsen this century. To reduce flood risk, the agency will build farther from the water wherever possible and will raise structures on stilts and pilings.

Along rivers, FEMA will rebuild at least as high as the 500-year floodplain, and sometimes higher for essential infrastructure such as bridges and hospitals. Similar standards in Houston are credited with savings thousands of homes from flooding earlier this month during Hurricane Beryl.

Related Stories

Codes and Standards | Nov 6, 2017

AIA releases new architect commissioning document

It will be used with the standard form for owner/consultant contracts.

Codes and Standards | Nov 2, 2017

ASHRAE releases new version of Thermal Comfort Standard

Update includes calculations from direct solar radiation.

Codes and Standards | Nov 1, 2017

Drone users can now get instant authorization from FAA

Skyward offers app to receive permission for low altitude flights.

Codes and Standards | Oct 31, 2017

Real estate giant launches global tenant health and wellness certification initiative

Tishman Speyer will use Fitwel health certification system to guide building improvements.

Codes and Standards | Oct 30, 2017

AIA revises architect scope documents in latest contract form release

Design-bid-build forms last updated in 2007.

Codes and Standards | Oct 26, 2017

Boston’s Old South Church asks tower developer for $19 million for casting shade

Request highlights ongoing conflict between developers and residents over right to sunshine.

Codes and Standards | Oct 24, 2017

Asphalt roofing design guide now available in digital form

Recently updated Modified Bitumen Design Guide can be viewed on smartphones and tablets.

Codes and Standards | Oct 23, 2017

Energy efficiency investments on the rise; will increase next year

Survey of facility management executives shows onsite renewables, energy storage will spike in 2018.

Codes and Standards | Oct 20, 2017

AIA contract document updates include new BIM, digital data provisions

Documents are structurally different from 2007, 2008 versions.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021