flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New federal buildings must be all-electric by 2030

Government Buildings

New federal buildings must be all-electric by 2030

Fossil fuels will be banned on new construction projects.


By Peter Fabris, Contributing Editor | May 10, 2024
Image by Jacqui from Pixabay
Image by Jacqui from Pixabay

A new Biden Administration rule bans the use of fossil fuels in new federal buildings beginning in 2030.

The announcement came despite longstanding opposition to the rule by the natural gas industry.  New federal buildings constructed between 2025 and 2029 must achieve a 90% decrease in fossil fuel consumption compared to 2003 levels.

New buildings or ones substantially renovated during and beyond 2030 cannot have any on-site fossil fuel use. The mandate was authorized by a 2007 energy law signed by President George W. Bush.

Over the next 30 years, the rule is expected to cut carbon emissions by 2 million metric tons and methane emissions by 16 thousand tons.

Related Stories

| Sep 7, 2012

Manhattan Construction Co. to build Fairfax office building

Designed by Noritake Associates of Alexandria Virginia, the project is LEED-registered, seeking LEED Silver certification.

| Aug 9, 2012

DMR Architects converts bank building to municipal court

The project consisted of a $4 million renovation to a 2-story building totaling 13,000-sf.

| Aug 7, 2012

How to win more state and local government projects

With a huge building stock at their disposal, state and local governments can be attractive clients, especially in these difficult economic times.

| Aug 1, 2012

CFSI ranked among Top 10 Mechanical Contractors in D.C.

Included in the Washington Business Journal list for the second year running.

| Jul 25, 2012

Contract awarded for Gaillard Municipal Auditorium renovations in Charleston, S.C.

Seeking LEED Silver certification, the project will begin in August and is slated for completion in December 2014.

| Jul 20, 2012

2012 Giants 300 Special Report

Ranking the leading firms in Architecture, Engineering, and Construction.

| Jul 19, 2012

AEC firms ready to dive into public projects

But the size of the pool keeps shrinking for the Top 25 AEC firms in the Government Sector.

| Jun 28, 2012

Federal applications of renewable energy

U.S. Army Fort Knox: Using the Earth for space heating and cooling. The U.S. Department of Energy’s (DOE) Federal Energy Management Program (FEMP) facilitates the Federal Government’s implementation of sound, cost-effective energy management and investment practices to enhance the nation’s energy security and environmental stewardship.

| Jun 27, 2012

KBE Building wins honor for Armed Forces Reserve Center

The construction phase was completed in just 16 months.

| Jun 19, 2012

Energy and Commerce Departments Announce New Centers for Building Operations Excellence

Part of Better Buildings Initiative, Centers Will Focus on Energy Efficiency Workforce Development for Building Operations Professionals

boombox1
boombox2
native1

More In Category



Laboratories

The Department of Energy breaks ground on the Princeton Plasma Innovation Center

In Princeton, N.J., the U.S. Department of Energy’s Princeton Plasma Physics Laboratory (PPPL) has broken ground on the Princeton Plasma Innovation Center (PPIC), a state-of-the-art office and laboratory building. Designed and constructed by SmithGroup, the $109.7 million facility will provide space for research supporting PPPL’s expanded mission into microelectronics, quantum sensors and devices, and sustainability sciences. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021