flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New edition of Building Code Requirements for Structural Concrete available

Codes and Standards

New edition of Building Code Requirements for Structural Concrete available

American Concrete Institute document includes major technical changes.


By Peter Fabris, Contributing Editor | August 15, 2019

Courtesy Pixabay

The American Concrete Institute has released ACI 318-19 Building Code Requirements for Structural Concrete.

The document includes:

— Major technical changes in higher reinforcing steel yield strengths

— The addition of shotcrete and deep foundation provisions

— Seismic requirements for deep foundations and other applications

— Vertical seismic motions

— Nonlinear analysis for seismic design

— Modification to development length equations

— Updated shear design provisions and equations

The document also identifies qualification training programs for inspectors/installers and lists certification requirements. The final code requirements of ACI 318-19 are expected to be referenced in the 2021 International Building Code.

Related Stories

| Aug 11, 2010

Best AEC Firms of 2011/12

Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â