flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New drinking water standard criteria further restricts lead leaching in plumbing products

Codes and Standards

New drinking water standard criteria further restricts lead leaching in plumbing products

Tightened standard applies to endpoint devices that dispense drinking water, and other plumbing components


By Peter Frabis, Contributing Editor | September 29, 2020

Courtesy Pixabay

Newly published changes to NSF/ANSI/CAN 61, the drinking water product standard used in the U.S. and Canada, reduce the amount of lead that can leach from plumbing products.

The “significantly more rigorous requirements” were approved after years of exploring various testing methods to reduce lead leaching from endpoint devices that dispense drinking water, as well as from other plumbing components, according to a NSF International news release.

More stringent pass/fail criteria for standard certification will require the maximum amount of lead leaching to be reduced from 5 micrograms (µg) to 1 µg for devices that dispense drinking water such as faucets, and from 3 µg to 0.5 µg for other plumbing components such as connector hoses and small shut-off valves. In-line mechanical devices and other product categories under NSF/ANSI/CAN 61 are not subject to the new requirements.

Revisions to the standard were approved by the Council of Public Health Consultants and ratified by the American National Standards Institute (ANSI) and the Standards Council of Canada (SCC). Certification of applicable products to the more stringent lead leaching criteria is optional for the next three years to allow manufacturers time to comply. On Jan. 1, 2024, all products will be required to meet the stricter requirements.

Related Stories

Codes and Standards | Jul 20, 2017

New tallest tower west of the Mississippi built to stringent seismic standards

L.A.’s new 1,100-foot skyscraper dominates city’s skyline.

Codes and Standards | Jul 19, 2017

Economic impacts of climate change will jump over next two decades

Average annual cost to buildings and infrastructure from eastern storms to rise by $7.3 billion.

Codes and Standards | Jul 18, 2017

Energy modeling yields accuracy within 4%, says new study

Results of the study support the usefulness of the practice.

Codes and Standards | Jul 13, 2017

Net Zero Energy rebranded as ‘Zero Energy’

ILF aims to make new certification the sole standard for highest performing buildings.

Codes and Standards | Jul 13, 2017

New York City creates $10 million fund to help women- and minority-owned firms win construction contracts

The money is earmarked for up to $500,000 surety bonds per contract.

Codes and Standards | Jul 12, 2017

New International Building Code allows weather-resistive barriers above 40 feet

Danger of propagating flames now deemed negligible.

Codes and Standards | Jul 10, 2017

New mass plywood panel project moves ahead with federal grant

New material is substitute for concrete and steel in multi-story projects.

Codes and Standards | Jul 6, 2017

Trump ups ante on apprenticeships, gives private sector more room to design them

Initiative aimed at alleviating construction industry worker shortage.

Codes and Standards | Jul 6, 2017

Flawed modeling to blame for green buildings failure to live up to hype on energy efficiency

Explains energy performance gap from expected savings to actual savings.

boombox1
boombox2
native1

More In Category


Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021