flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New design guide for hybrid steel-mass timber frames released

Codes and Standards

New design guide for hybrid steel-mass timber frames released

Arup-authored document encourages the use of mass timber floor systems.


By Peter Fabris, Contributing Editor | June 2, 2022
Steel Construction
Courtesy Pixabay.

The American Institute of Steel Construction (AISC) has released the first-ever set of U.S. recommendations for hybrid steel frames with mass timber floors, according to a news release.

Design Guide 37: Hybrid Steel Frames with Wood Floors, written by Arup, encourages the use of mass timber floor systems in construction, “an underused yet important material to reduce the amount of carbon-intensive concrete in a structure,” the release says. The guide provides a comprehensive context for this new building typology, detailing strategies from the perspective of multiple disciplines.

By facilitating this new generation of sustainable buildings, the guide will help accelerate the use of hybrid timber and steel in multistory residential and commercial construction. Mass timber is lightweight, and steel provides strength to structures and may better meet buildings’ vibration and span requirements.

Hybrid steel-frame buildings with mass timber floor panels allow for longer beam spans and reduced column size than comparable mass-timber post and beam construction, making it an attractive option for market-driven spaces such as office buildings. Cross-laminated timber (CLT) flooring can take the place of carbon-intensive concrete slabs and may be left exposed in places, such as at soffits, eliminating the need for additional architectural finishes and allowing for the showcasing of the structural aesthetics of both steel and mass timber.

“Mass timber and steel hybrid systems have tremendous potential to advance the building industry’s sustainability goals and reduce global emissions,” said Michelle Roelofs, associate principal at Arup. “Illuminating pathways for this hybrid topology will help accelerate the use of timber in place of more carbon-intensive materials.”
 

Related Stories

Codes and Standards | Nov 10, 2021

Los Angeles launches fast-track office tenant improvements program

Red tape to be cut to make interiors healthier and safer.

Codes and Standards | Nov 9, 2021

Florida state building professionals call for mandatory high-rise building inspections

Group recommendation comes in wake of Surfside condo collapse.

Codes and Standards | Nov 8, 2021

Dept. of Energy to fund 10 pilot smart building projects

Connected communities will accelerate renewable energy adoption and grid resilience.

Codes and Standards | Nov 3, 2021

Fact sheets offer strategies to improve indoor air quality in schools

Center for Green Schools at USGBC document for people without a technical background.

Codes and Standards | Nov 2, 2021

Rapid acceleration of affordable housing development expected over next five years

Federal government programs will spur construction.

Codes and Standards | Nov 1, 2021

New bird-friendly technical design guide released

National Glass Assn. document offers design and installation best practices for glazing.

Codes and Standards | Nov 1, 2021

World’s first chief heat officer tackles how to protect Miamians from extreme heat

Focus on chronic exposure for outdoor workers and for those that can’t afford AC.

Codes and Standards | Oct 28, 2021

Design competition launched to show role of mass timber in decarbonization

Forest Service and Softwood Lumber Board will award $2 million in grants to winning teams.

Codes and Standards | Oct 27, 2021

Texas reforms series of contractor laws

Measures seen as making it easier to do business in the state.

Codes and Standards | Oct 26, 2021

Drownings during Hurricane Ida point out FEMA flood map flaws

Eleven people drowned in New York City in areas marked as low risk.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021