flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Denver hotel will integrate historic 130-year-old fire station into its design

Hotel Facilities

New Denver hotel will integrate historic 130-year-old fire station into its design

The 1883 Denver Hose Company No.1 building will be fully restored as part of the project.


By David Malone, Associate Editor | January 25, 2017

Rendering courtesy of Johnson Nathan Strohe.

A new 12-story hotel has broken ground in Denver near Coors Field and Union Station and while the majority of the hotel will have a sleek, modern aesthetic, one component will definitely stand out from the rest.

The historic Denver Hose Company No.1 building, which was constructed in 1883, will be incorporated into the hotel’s design. The building was listed as a city historic landmark in 1986 and is one of the only remaining structures from an early Denver neighborhood called the “Bottoms,” The Denver Post reports. The building is described as having beautiful brickwork, especially around the two front facing arches.

The building will be completely restored as part of the $80 million hospitality project and will serve as a restaurant and outdoor patios for the hotel. The patios will face Chestnut Place and 20th Street.

And the restoration couldn’t come a moment too soon. The fire station has been in a state of disrepair for years now, to the point where some people worried about it becoming a safety issue. It had all the looks of a structure ready to collapse on itself, but with help from the city and Historic Denver (an organization that preserves local Denver history, architecture, and landscapes), the building was stabilized until the restoration could begin.

Johnson Nathan Strohe and Boss Architecture designed the new hotel, which will be a Hilton Garden Inn. It will comprise 233 guest rooms and be operated by Davidson Hotels. Among the amenities the hotel will offer are a ballroom, meeting space, underground parking, and a fitness center.

The new Hilton Garden Inn is expected to open in early 2019.

Related Stories

| Nov 19, 2013

Pediatric design in an adult hospital setting

Freestanding pediatric facilities have operational and physical characteristics that differ from those of adult facilities.

| Nov 19, 2013

Top 10 green building products for 2014

Assa Abloy's power-over-ethernet access-control locks and Schüco's retrofit façade system are among the products to make BuildingGreen Inc.'s annual Top-10 Green Building Products list. 

| Nov 18, 2013

6 checkpoints when designing a pediatric healthcare unit

As more time and money is devoted to neonatal and pediatric research, evidence-based design is playing an increasingly crucial role in the development of healthcare facilities for children. Here are six important factors AEC firms should consider when designing pediatric healthcare facilities.

| Nov 15, 2013

Greenbuild 2013 Report - BD+C Exclusive

The BD+C editorial team brings you this special report on the latest green building trends across nine key market sectors. 

| Nov 15, 2013

Pedia-Pod: A state-of-the-art pediatric building module

This demonstration pediatric treatment building module is “kid-friendly,” offering a unique and cheerful environment where a child can feel most comfortable. 

| Nov 13, 2013

Installed capacity of geothermal heat pumps to grow by 150% by 2020, says study

The worldwide installed capacity of GHP systems will reach 127.4 gigawatts-thermal over the next seven years, growth of nearly 150%, according to a recent report from Navigant Research.

| Nov 8, 2013

Oversized healthcare: How did we get here and how do we right-size?

Healthcare facilities, especially our nation's hospitals, have steadily become larger over the past couple of decades. The growth has occurred despite stabilization, and in some markets, a decline in inpatient utilization.

| Nov 6, 2013

Green hotel trends: Industry expands its sustainability focus beyond laundry

There’s more to creating a sustainable hotel than saving water and power by asking guests to reuse their towels.

| Oct 30, 2013

15 stellar historic preservation, adaptive reuse, and renovation projects

The winners of the 2013 Reconstruction Awards showcase the best work of distinguished Building Teams, encompassing historic preservation, adaptive reuse, and renovations and additions.

| Oct 30, 2013

11 hot BIM/VDC topics for 2013

If you like to geek out on building information modeling and virtual design and construction, you should enjoy this overview of the top BIM/VDC topics.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021