flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New cross-laminated timber fire tests back proponents of high-rise wood structures

Codes and Standards

New cross-laminated timber fire tests back proponents of high-rise wood structures

'Demonstrating for the first time the feasibility of tall mass timber buildings in the U.S.’


By Peter Fabris, Contributing Editor | October 20, 2016

Photo: Oregon State University, flickr Creative Commons.

The Framework Project, LLC announced that the company has successfully completed two significant fire tests on Cross-laminated Timber as a building material, “demonstrating for the first time the feasibility of tall mass timber buildings in the U.S.”

The two tests provide proof that a mass timber assembly using Cross-laminated Timber (CLT) and Glue-laminated timber (glulam) can be used safely while meeting stringent fire code requirements. Tall wood buildings using CLT and glulam have already been permitted in Europe, Australia, and Canada.

The tests also achieved breakthrough results, Framework Project says. A two-hour fire rating for the glulam beam to glulam column connection is a “fundamental breakthrough in mass timber construction, exceeding results conducted anywhere in the world.” This construction system allows mass timber to be used for high-rise construction, with some of the timber exposed. In previous CLT fire tests, the structural frame of timber has been concealed under layers of gypsum board.

Tests were conducted by Southwest Research Institute (SwRi), an independent, nonprofit, applied research and development organization.

Related Stories

Codes and Standards | Oct 14, 2016

ASCE issues first tsunami-safe building standards

The new standards will become part of international building code.

Codes and Standards | Oct 12, 2016

Making concrete greener

The high energy-consuming material can be made more sustainably.

Codes and Standards | Oct 11, 2016

Historic preservation moving beyond saving grand old buildings

National Trust for Historic Preservation CEO says the focus is on saving cities, not just buildings

Codes and Standards | Oct 10, 2016

Los Angeles voters will decide whether high-density developments should be harder to build

A March vote on the Neighborhood Integrity Initiative would put 2-year ban on zoning changes

Codes and Standards | Oct 10, 2016

New sustainable landscape development and management credential launched

GBCI offered the first testing opportunity Oct. 3 at Greenbuild

Codes and Standards | Oct 6, 2016

Obama administration will spend $80 million for smart cities initiatives

The technology is targeted for climate, transportation, resiliency.

Codes and Standards | Oct 6, 2016

New York City files criminal charges on owner for deadly building façade accident

The owner allegedly did not heed warning about danger of the crumbling exterior.

Codes and Standards | Oct 5, 2016

New York becomes the first city to adopt a target for energy storage

Mayor de Blasio also announces increased solar generation goals

Codes and Standards | Oct 4, 2016

New global residential floor space measurement standard unveiled

The new standards will produce better transparency and are said to benefit investors.

Codes and Standards | Sep 29, 2016

Dept. of Energy forecasts big jump in LED use, resulting energy savings

Big gains are expected in both commercial and residential markets.

boombox1
boombox2
native1

More In Category

Reconstruction & Renovation

Movement to protect historic buildings raises sharp criticism

While the movement to preserve historic buildings has widespread support, it also has some sharp critics with well-funded opposition groups springing up in recent years. Some opponents are linked to the Stand Together Foundation, founded and bankrolled by the Koch family’s conservative philanthropic organization, according to a column in Governing magazine.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021