flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New cross-laminated timber fire tests back proponents of high-rise wood structures

Codes and Standards

New cross-laminated timber fire tests back proponents of high-rise wood structures

'Demonstrating for the first time the feasibility of tall mass timber buildings in the U.S.’


By Peter Fabris, Contributing Editor | October 20, 2016

Photo: Oregon State University, flickr Creative Commons.

The Framework Project, LLC announced that the company has successfully completed two significant fire tests on Cross-laminated Timber as a building material, “demonstrating for the first time the feasibility of tall mass timber buildings in the U.S.”

The two tests provide proof that a mass timber assembly using Cross-laminated Timber (CLT) and Glue-laminated timber (glulam) can be used safely while meeting stringent fire code requirements. Tall wood buildings using CLT and glulam have already been permitted in Europe, Australia, and Canada.

The tests also achieved breakthrough results, Framework Project says. A two-hour fire rating for the glulam beam to glulam column connection is a “fundamental breakthrough in mass timber construction, exceeding results conducted anywhere in the world.” This construction system allows mass timber to be used for high-rise construction, with some of the timber exposed. In previous CLT fire tests, the structural frame of timber has been concealed under layers of gypsum board.

Tests were conducted by Southwest Research Institute (SwRi), an independent, nonprofit, applied research and development organization.

Related Stories

Codes and Standards | May 10, 2017

OSHA increases penalties on South Dakota contractor after fatal building collapse

Agency issues over $300,000 in fines for ‘willful’ safety violations.

Codes and Standards | May 9, 2017

Potential shade on Boston Common from proposed high-rise raises public ire

The Mayor is among those who want to change 1990s anti-shadow law.

Codes and Standards | May 9, 2017

Method of estimating amount of CO2 by building occupants may be inaccurate

New research suggests current estimates may be off by as much as 25%.

Codes and Standards | May 8, 2017

National Fenestration Rating Council’s new U-factor standard open for public comment

Member-approved ballot change to NFRC 100 comments to close on May 28.

Codes and Standards | May 4, 2017

Millennials’ views on sustainability could influence the workplace

Nine out of ten say it is important that they work for a company committed to sustainability.

Codes and Standards | May 3, 2017

New York State extends design-build authority

The legislation includes eight additional projects.

Codes and Standards | May 2, 2017

U.S. announces preliminary tariffs on Canadian softwood lumber

The rates range from 3% to 24% per producer.

Codes and Standards | Apr 28, 2017

New York man alleged to have posed as licensed architect faces possible prison time

He is charged with defrauding construction companies, business owners, and local governments.

Codes and Standards | Apr 27, 2017

Extensive list of plug load efficiency utility incentives available for free download

The Dept. of Energy resource is a state-by-state compilation with hundreds of listings.

Codes and Standards | Apr 26, 2017

Chicago commits to 100% renewable power for all city buildings

In doing so, it becomes largest U.S. city to make such a pledge.

boombox1
boombox2
native1

More In Category

Reconstruction & Renovation

Movement to protect historic buildings raises sharp criticism

While the movement to preserve historic buildings has widespread support, it also has some sharp critics with well-funded opposition groups springing up in recent years. Some opponents are linked to the Stand Together Foundation, founded and bankrolled by the Koch family’s conservative philanthropic organization, according to a column in Governing magazine.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021