flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New, comprehensive insurance exhibit released in AIA 2017 contract document updates

Codes and Standards

New, comprehensive insurance exhibit released in AIA 2017 contract document updates

Will allow AIA to make updates more frequently as insurance market changes.


By Peter Fabris, Contributing Editor | October 16, 2017
Documents
Documents

The updated AIA 2017 project contract documents include a new, comprehensive insurance exhibit that will allow for easier, more frequent updates as conditions in the insurance market change.

The insurance exhibit is intended to be used in conjunction with the A101–2017, A102–2017, and A103–2017 contract documents. One goal of the document’s drafters was to make it easier for users to transmit the insurance exhibit to the user’s insurance advisor or broker for evaluation and completion. AIA says the new insurance exhibit will allow changes to be made without having to revise the General Conditions document.

The insurance exhibit requires either the owner or the contractor to purchase property insurance written on a builder's risk “all-risks” completed value or equivalent policy form. It should be of an amount that can cover the total value of the entire project on a replacement cost basis. If the project is a remodeling of an existing structure or addition to one, the property insurance must also cover the existing structure against physical loss or damage on a replacement cost basis.

The insurance must be maintained through substantial completion and continued or replaced through the contractor’s one-year period for correction of the work. The insurance must include the interests of the owner, contractor, subcontractors, and sub-subcontractors, and the interests of mortgagees as loss payees.

In addition to the required property coverage, the agreement may include optional extended property insurances that the owner will purchase and maintain. This could include

Ordinance or Law Insurance; Expediting Cost Insurance; and Loss of Use, Business Interruption, and Delay in Completion Insurance.

For more information, visit: www.aiacontracts.org.

Related Stories

Higher Education | May 5, 2022

To keep pace with demand, higher ed will have to add 45,000 beds by year-end

The higher education residential sector will have to add 45,000 beds by the end of 2022 to keep pace with demand, according to a report by Humphreys & Partners Architects.

Legislation | May 4, 2022

Washington is first state to mandate all-electric heat for new large buildings

Washington recently became the first state to require all electric heat for new buildings.

Sponsored | Healthcare Facilities | May 3, 2022

Planning for hospital campus access that works for people

This course defines the elements of hospital campus access that are essential to promoting the efficient, stress-free movement of patients, staff, family, and visitors. Campus access elements include signage and wayfinding, parking facilities, transportation demand management, shuttle buses, curb access, valet parking management, roadways, and pedestrian walkways.

Codes and Standards | May 3, 2022

American Institute of Steel Construction updates environmental product declarations

The American Institute of Steel Construction has released updated environmental product declarations (EPDs) “to help designers and building owners design more environmentally friendly buildings and bridges,” according to an AISC news release.

Codes and Standards | May 2, 2022

Developer Hines, engineer MKA develop free embodied carbon reduction guide

Real estate management and investment firm Hines has released the Hines Embodied Carbon Reduction Guide. The free guide, produced with Magnusson Klemencic Associates (MKA), is the result of a two-year effort, relying on MKA’s industry-leading knowledge of carbon accounting and involvement in programs such as the Embodied Carbon in Construction Calculator (EC3) Tool.

Codes and Standards | Apr 28, 2022

Architecture firm Perkins&Will to deliver ‘carbon forecasts’ for clients

Global architecture firm Perkins&Will says it will issue its clients a “carbon forecast” for their projects.

Codes and Standards | Apr 27, 2022

White House guidance on Buy American for infrastructure includes waiver process

Recently released guidance on the Buy American provision within the $1.2 trillion Infrastructure Investment and Jobs Act released by the Office of Management and Budget includes a waiver process.

Multifamily Housing | Apr 26, 2022

Investment firm Blackstone makes $13 billion acquisition in student-housing sector

Blackstone Inc., a New York-based investment firm, has agreed to buy student-housing owner American Campus Communities Inc.

Codes and Standards | Apr 25, 2022

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.

Legislation | Apr 21, 2022

NIMBYism in the Sunbelt stymies new apartment development

Population growth in Sunbelt metro areas is driving demand for new apartment development, but resistance is growing against these projects.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021