flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New, comprehensive insurance exhibit released in AIA 2017 contract document updates

Codes and Standards

New, comprehensive insurance exhibit released in AIA 2017 contract document updates

Will allow AIA to make updates more frequently as insurance market changes.


By Peter Fabris, Contributing Editor | October 16, 2017
Documents
Documents

The updated AIA 2017 project contract documents include a new, comprehensive insurance exhibit that will allow for easier, more frequent updates as conditions in the insurance market change.

The insurance exhibit is intended to be used in conjunction with the A101–2017, A102–2017, and A103–2017 contract documents. One goal of the document’s drafters was to make it easier for users to transmit the insurance exhibit to the user’s insurance advisor or broker for evaluation and completion. AIA says the new insurance exhibit will allow changes to be made without having to revise the General Conditions document.

The insurance exhibit requires either the owner or the contractor to purchase property insurance written on a builder's risk “all-risks” completed value or equivalent policy form. It should be of an amount that can cover the total value of the entire project on a replacement cost basis. If the project is a remodeling of an existing structure or addition to one, the property insurance must also cover the existing structure against physical loss or damage on a replacement cost basis.

The insurance must be maintained through substantial completion and continued or replaced through the contractor’s one-year period for correction of the work. The insurance must include the interests of the owner, contractor, subcontractors, and sub-subcontractors, and the interests of mortgagees as loss payees.

In addition to the required property coverage, the agreement may include optional extended property insurances that the owner will purchase and maintain. This could include

Ordinance or Law Insurance; Expediting Cost Insurance; and Loss of Use, Business Interruption, and Delay in Completion Insurance.

For more information, visit: www.aiacontracts.org.

Related Stories

Codes and Standards | Nov 18, 2016

Canada GBC launching Zero Carbon Buildings Initiative

First step toward Zero Carbon Building Standard.

Codes and Standards | Nov 17, 2016

Santa Monica, Calif., passes historic net-zero ordinance

Includes more stringent commercial, multifamily building standards.

Codes and Standards | Nov 14, 2016

Los Angeles voters approve billions to tackle traffic and homelessness

The approved measures will create new rail lines and permanent housing.

Codes and Standards | Nov 9, 2016

NRMCA updates environmental impacts of concrete

The EPD now includes 88 companies, 72 mixes.

Codes and Standards | Nov 9, 2016

Louisiana flood projections require urgent action, officials say

The 'no net loss’ prediction now seems unrealistic.

Codes and Standards | Nov 8, 2016

American Concrete Institute offers new guide for repair of concrete buildings

The guide provides assistance on assessment and rehab.

Codes and Standards | Nov 4, 2016

Obama Administration makes a push for denser, more affordable cities

The administration calls for zoning code changes and other measures to create more housing. 

Codes and Standards | Nov 3, 2016

OSHA proposes safety standards changes to reduce employer costs

The changes include clarification on excavation standard and reporting job-related hearing loss.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021