flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Chicago hospital prepared for pandemic, CBR terror threat

New Chicago hospital prepared for pandemic, CBR terror threat

At a cost of $654 million, the 14-story, 830,000-sf medical center, designed by a Perkins+Will team led by design principal Ralph Johnson, FAIA, LEED AP, is distinguished in its ability to handle disasters. 


By By BD+C Staff | January 3, 2012
At the new $654 million Rush University Medical Center, the ground-level hospital entryway includes a four-story, all-season ope
This article first appeared in the January 2012 issue of BD+C.

The butterfly-shaped facility that is the new Rush University Medical Center (RUMC) sits quietly on the Near West Side of Chicago awaiting the official opening of its doors this month. The RUMC facility and its staff are preparing to handle any type of pandemic or chemical, biological, or radiological (CBR) disaster that might hit Chicago.

At a cost of $654 million, the 14-story, 830,000-sf medical center, designed by a Perkins+Will team led by design principal Ralph Johnson, FAIA, LEED AP, is distinguished in its ability to handle disasters.

If such an event were to hit the Chicago area, the emergency response center could offer an unprecedented level of readiness for a mass outbreak of infectious disease, bioterrorist attack, or hazmat incident.

“This is the nation’s first facility designed to provide care for patients involved in chemical, biological, and radiological disasters,” says Dr. Dino Rumoro, RUMC’s chairman of emergency medicine. “We have to be ready for any type of disaster that can hit the city of Chicago.”

The 40,000-sf emergency room includes:

  • 60 individual treatment bays that can accommodate up to two patients per bay, doubling the normal patient load
  • The ability to control airflow to seal off contagions in parts of the hospital
  • Ambulance bays that can be converted into decontamination centers, so that CBR victims could be sprayed down in large groups

Special equipment and a flexible infrastructure allow RUMC to accommodate surge capacity to treat mass casualties beyond the ER. Pillars in the main lobby are equipped with hidden panels that provide access to oxygen and other clinical gases, allowing RUMC to accommodate even more beds in a disaster scenario.

The floors above the emergency room are devoted to the interventional platform, where diagnostic testing, surgical, and interventional services and recovery are located within a short distance of each other. This results in enhanced collaboration between medical specialists, patients, and families. A total of 42 procedure rooms with enlarged operating rooms provide the latest surgical technology.

The new hospital adds 304 individual adult and critical beds on its top five floors, increasing the total number of beds across existing and new facilities to 664, making RUMC one of the largest hospitals in the area.

The hospital is awaiting LEED Gold certification. In addition to using recycled construction materials and considerable water- and energy-saving measures, the hospital has three green roofs—one atop the main tower, another on the ninth floor open to staff, and a third atop the entry pavilion. BD+C

Related Stories

Resiliency | May 17, 2018

Architects brief lawmakers and policy-makers on disaster recovery as hurricane season approaches

Urge senate passage of disaster recovery reform act; Relationship-building with local communities.

Architects | May 14, 2018

4 tactics for our digital transformation

While our technology is becoming more advanced, the fundamental processes at the core of design and construction businesses have largely remained unchanged for decades.

Architects | May 8, 2018

WeWork names BIG’s Ingels as its Chief Architect

He’ll be plenty busy working with a company that has aggressive growth ambitions.

Architects | May 8, 2018

Illinois Office of Tourism unveils new Frank Lloyd Wright Trail

The trail stretches from Rockford to Springfield.

Architects | May 3, 2018

Designing innovative solutions for chronic homelessness

What’s stopping us from creating more Permanent Supportive Housing? 

Architects | Apr 27, 2018

4 reasons to pursue speaking engagements

We found speaking engagements were among the top ten marketing techniques that AEC firms employ.

Office Buildings | Apr 19, 2018

From fitness to bowling alleys: How commercial office buildings are differentiating themselves through amenities

Here are five ways that amenities can help developers and building owners attract and secure tenants by appealing to their inhabitants.

Architects | Apr 19, 2018

Perkins Eastman and Dougherty announce intent to merge

Combined practice will create expanded capabilities for K-12, higher education projects in California.

Architects | Apr 17, 2018

Cannon Design expects merger with gkkworks will help streamline its deliveries

The combined firm reinforces its presence in the western U.S.

Architects | Apr 16, 2018

Is the AEC industry ready to shake off its retrograde image?

Technology has been and always will be perceived as a source for wonder and worry.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021