flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New cannabis dispensary under construction in Northbrook, Ill.

Retail Centers

New cannabis dispensary under construction in Northbrook, Ill.

The project will be a national flagship location for Greenhouse.


By David Malone, Associate Editor | June 17, 2020

Rendering courtesy CFC

Cannabis Facility Construction (CFC), a full-service cannabis design-build construction firm based in Northbrook, Ill., has begun construction on a new recreational and medical cannabis dispensary for Greenhouse. The project, which is located at 755 Skokie Boulevard in Northbrook, will be a national flagship location for the brand.

Comprising 10,000 sf, the wood and masonry structure will have a modern, industrial design that will represent a new look for the Greenhouse brand. The space will have an open floor plan with vaulted ceilings, skylights and abundant natural light, and easy-to-browse product displays. The project was designed with social distancing in mind, ensuring all points of sale are six feet apart.

 

See also: The coming bonanza in marijuana facilities

 

Retail space in the front of the building will be complemented by back office space for processing. A secure, oversized vault for substantial inventory storage and an advanced security system are also included. The facility’s exterior will feature natural landscaping, a retention pond, and a large parking lot, all revitalizing a location that has sat vacant for a long time.

Construction on the project, which will be Greenhouse’s largest dispensary to date, began in May.

Related Stories

| Sep 23, 2011

Under 40 Leadership Summit

Building Design+Construction’s Under 40 Leadership Summit takes place October 26-28, 2011 Hotel at the Monteleone in New Orleans. Discounted hotel rate deadline: October 2, 2011.  

| May 17, 2011

Redesigning, redefining the grocery shopping experience

The traditional 40,000- to 60,000-sf grocery store is disappearing and much of the change is happening in the city. Urban infill sites and mixed-use projects offer grocers a rare opportunity to repackage themselves into smaller, more efficient, and more convenient retail outlets. And the AEC community will have a hand in developing how these facilities will look and operate.

| Apr 12, 2011

Retail complex enjoys prime Abu Dhabi location

The Galleria at Sowwah Square in Abu Dhabi will be built in a prime location within Sowwah Island that also includes a five-star Four Seasons Hotel, the healthcare facility Cleveland Clinic Abu Dhabi, and nearly two million sf of Class A office space.

| Mar 30, 2011

Big-box giants downsize, open smaller, urban stores

As U.S. chain retailers absorb the lessons of the Great Recession, many big-box chains have started to shrink average store footprints to reflect the growing importance of multi-channel shopping, adapt to urban settings, and recognize the need to optimize portfolios. Wal-Mart, Target, Best Buy, and the Gap, among others, all have small concepts in the works or are adapting existing ones. These smaller store formats should allow the retailers to maximize profitability and open more stores in closer proximity to each other.

| Mar 22, 2011

Mayor Bloomberg unveils plans for New York City’s largest new affordable housing complex since the ’70s

Plans for Hunter’s Point South, the largest new affordable housing complex to be built in New York City since the 1970s, include new residences for 5,000 families, with more than 900 in this first phase. A development team consisting of Phipps Houses, Related Companies, and Monadnock Construction has been selected to build the residential portion of the first phase of the Queens waterfront complex, which includes two mixed-use buildings comprising more than 900 housing units and roughly 20,000 square feet of new retail space.

| Feb 23, 2011

Unprecedented green building dispute could cost developer $122.3 Million

A massive 4.5 million-sf expansion of the Carousel Center shopping complex in Syracuse, N.Y., a project called Destiny USA, allegedly failed to incorporate green building components that developers had promised the federal government—including LEED certification. As a result, the project could lose its tax-exempt status, which reportedly saved developer The Pyramid Cos. $120 million, and the firm could be penalized $2.3 million by the IRS.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021