flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New California energy code requires building systems to be ready for demand response energy management

New California energy code requires building systems to be ready for demand response energy management

Title 24 requires thermostats, HVAC systems, networked lighting controllers, and building automation systems to be ready for two-way communication


April 10, 2014

Starting in June, California’s latest version of its Title 24 building code kicks in, requiring several systems come with demand response capability. Every new or retrofit thermostat, HVAC system, networked lighting controller, and building automation system in the state will have to be ready for two-way, automated utility-to-customer energy management. Non-residential building lighting systems will be required to have daylight-matching adjustment, dimming and demand response capabilities.

These devices and systems will be required to be “capable of receiving and automatically responding to at least one standards-based messaging protocol” to receive signals from utilities. There are a few standards that meet the requirement— OpenADR, SEP 2.0, and HomePlug.

OpenADR was developed by the California Energy Commission and Berkeley Labs. It offers tools to allow buildings and utilities to communicate about energy availability, price, and how buildings can execute and confirm actions to reduce power use.

These standards were enacted after the California Energy Commission identified flaws in the state’s approach to demand response in a 2013 report, including a failure to reach modest goals set in 2007 to reduce peak demand by 5%. The solution may come from a market-based program to encourage users to reduce demand during peak energy use periods. The new demand-response standards pave the way for this option.

(http://www.greentechmedia.com/articles/read/californias-title-24-a-grid-smart-thermostat-in-every-building)

Related Stories

Codes and Standards | Dec 8, 2021

Proposals to add more multifamily to Atlanta prompt drive for Buckhead to secede

City aims to increase housing as projections point to sharp population increase.

Codes and Standards | Dec 7, 2021

Design problems now the primary cause of construction claims and disputes

More likely to occur due to more tight timescales imposed upon third parties engaged in design.

Codes and Standards | Dec 5, 2021

New standard for Phase I environmental reports requires more research work on many sites

Update affects around 250,000 commercial real estate transactions a year.

Codes and Standards | Nov 30, 2021

Dept. of Energy publishes RFP for technical assistance on supporting better building codes

Addresses advanced standards to reduce energy consumption and GHG emissions.

Codes and Standards | Nov 29, 2021

FAA seeking design of air traffic control towers of the future

Call for design submissions for safe, efficient structures.

Codes and Standards | Nov 28, 2021

Efficient electric water heaters in multifamily buildings significantly reduce carbon emissions

In buildings with 5+ units, water heating uses more energy than space heating, cooling, or lighting.

Codes and Standards | Nov 23, 2021

New York’s Labor Law Section 240 and how it affects general contractors

The ‘Scaffold Law’ was first enacted by the New York State Legislature in 1885 and is one of the single most-used laws in construction accident cases.

Codes and Standards | Nov 22, 2021

ABC’s Construction Technology Report finds focus on solving operational problems

More than half rely on project management software.

Codes and Standards | Nov 22, 2021

Contractors say 811 utility location system has significant flaws

More than half of firms in survey report damages, near misses because lines were unmarked or marked incorrectly.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021