flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New California energy code requires building systems to be ready for demand response energy management

New California energy code requires building systems to be ready for demand response energy management

Title 24 requires thermostats, HVAC systems, networked lighting controllers, and building automation systems to be ready for two-way communication


April 10, 2014

Starting in June, California’s latest version of its Title 24 building code kicks in, requiring several systems come with demand response capability. Every new or retrofit thermostat, HVAC system, networked lighting controller, and building automation system in the state will have to be ready for two-way, automated utility-to-customer energy management. Non-residential building lighting systems will be required to have daylight-matching adjustment, dimming and demand response capabilities.

These devices and systems will be required to be “capable of receiving and automatically responding to at least one standards-based messaging protocol” to receive signals from utilities. There are a few standards that meet the requirement— OpenADR, SEP 2.0, and HomePlug.

OpenADR was developed by the California Energy Commission and Berkeley Labs. It offers tools to allow buildings and utilities to communicate about energy availability, price, and how buildings can execute and confirm actions to reduce power use.

These standards were enacted after the California Energy Commission identified flaws in the state’s approach to demand response in a 2013 report, including a failure to reach modest goals set in 2007 to reduce peak demand by 5%. The solution may come from a market-based program to encourage users to reduce demand during peak energy use periods. The new demand-response standards pave the way for this option.

(http://www.greentechmedia.com/articles/read/californias-title-24-a-grid-smart-thermostat-in-every-building)

Related Stories

| Oct 18, 2012

EPA commercial building lead paint rule pushed back to 2015

The U.S. Environmental Protection Agency's inclusion of commercial buildings in a residential lead paint rule is being delayed until 2015.

| Oct 18, 2012

Chicago pushing green roofs to reduce heat island effect

The city of Chicago has mandated that all new buildings that require any public funds must be LEED certified, usually with a green roof.

| Oct 11, 2012

OSHA launches pilot program for alternative dispute resolution on whistleblower complaints

The Occupational Safety and Health Administration (OSHA) is launching an alternative dispute resolution (ADR) pilot program for complaints filed with OSHA's Whistleblower Protection Program.

| Oct 11, 2012

Bill promotes investment in commercial, multifamily retrofits

The Commercial Building Modernization Act recently introduced in the Senate would extend and streamline a current tax deduction to encourage commercial and multifamily residential building owners to perform comprehensive energy-efficient retrofits.

| Oct 11, 2012

Morristown, N.Y., settles code violation dispute with Amish

The town of Morristown, N.Y., has dropped charges of building code violations against local Amish communities to settle a First Amendment complaint.

| Oct 11, 2012

Mesquite, Nev., rebels against state-mandated energy code

The city council of Mesquite, Nev., voted against adopting a new energy efficiency code adopted by the state.

| Oct 11, 2012

Bloomingdale, N.J., restricts ground solar and wind energy installations

The borough of Bloomingdale, N.J., recently adopted regulations for solar-energy and wind energy systems.

| Oct 3, 2012

Bill introduced to extend home energy efficiency tax credit

A bill to extend the expired residential energy efficiency tax credit for installing qualified furnaces, boilers, central air conditioners, and heat pumps was recently filed in the U.S. House of Representatives.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021