flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New buildings can fall short of designed performance

Codes and Standards

New buildings can fall short of designed performance

Similar structures can produce different energy usage results.


By Peter Fabris, Contributing Editor | June 29, 2020

Courtesy Pixabay

Using modern building materials and a new building management system or control system doesn’t always produce a highly efficient building, a systems engineer tells GlobeSt.

New buildings don’t always perform as designed due to many variables. Energy loads and when the loads peak can vary no matter the design, and similar buildings can produce far different energy usage outcomes.

How the building is commissioned can impact energy efficiency, and different tenants can use energy differently. Building systems need to be fine-tuned, and controls have to be adapted for the specific building. You can’t “copy and paste” from another building even if it has nearly identical characteristics.

Newer technology can identify inaccurate readings in building management systems, and identify problems or savings opportunities in the building. That goes for new buildings as well as old structures.

Related Stories

Codes and Standards | Apr 5, 2019

Manhattan expected to adopt congestion pricing plan for automobiles

New York would be first U.S. city to charge drivers extra for downtown motoring.

Codes and Standards | Apr 4, 2019

Chicago makes major building code overhaul

Previous comprehensive changes were done 70 years ago.

Codes and Standards | Apr 3, 2019

Construction advanced materials makers can enhance industry efficiency with technology

Integration of new IT approaches in construction with new materials has potential to enhance sustainability, alleviate worker shortage.

Codes and Standards | Apr 2, 2019

Open offices reduce collaboration among employees

Counterintuitive finding makes value of wide open workspaces questionable.

Codes and Standards | Mar 29, 2019

New timber traceability LEED credit released

Pilot credit aims to reduce use of illegal wood in buildings.

Codes and Standards | Mar 28, 2019

Swinerton forms new mass timber business group

Will pursue new projects being developed with mass timber.

Codes and Standards | Mar 27, 2019

Shortage of skilled construction workers resulting in missed deadlines

Some 40% of contractors have turned down project offers.

Codes and Standards | Mar 25, 2019

ICC release 2019 guidelines for safe use of repurposed shipping containers

Provides in-depth, technical overview on how to design, review, and approve shipping containers as building elements.

Codes and Standards | Mar 22, 2019

Tool helps cities develop framework for life-cycle energy policies and track progress

Identifies policies, funding sources to address building energy use.

Codes and Standards | Mar 21, 2019

New York City contractors adding 5% to 10% to construction costs due to trade war

Tariffs on steel, aluminum, and other materials swell budgets.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021