flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New buildings can fall short of designed performance

Codes and Standards

New buildings can fall short of designed performance

Similar structures can produce different energy usage results.


By Peter Fabris, Contributing Editor | June 29, 2020

Courtesy Pixabay

Using modern building materials and a new building management system or control system doesn’t always produce a highly efficient building, a systems engineer tells GlobeSt.

New buildings don’t always perform as designed due to many variables. Energy loads and when the loads peak can vary no matter the design, and similar buildings can produce far different energy usage outcomes.

How the building is commissioned can impact energy efficiency, and different tenants can use energy differently. Building systems need to be fine-tuned, and controls have to be adapted for the specific building. You can’t “copy and paste” from another building even if it has nearly identical characteristics.

Newer technology can identify inaccurate readings in building management systems, and identify problems or savings opportunities in the building. That goes for new buildings as well as old structures.

Related Stories

| Sep 29, 2011

Illinois Grapples With Definition of ‘Clean’ Construction Debris

The Illinois Pollution Control Board holds hearings this week about construction debris rules proposed by the state Environmental Protection Agency. 

| Sep 15, 2011

Alabama Prepares First Statewide Residential Building Code

Following a series of devastating tornadoes that ripped through Alabama on April 27th, the state is preparing to implement the first statewide building code for residential structures.  

| Sep 15, 2011

New Label Established For Energy Efficient Doors in UK

The British Fenestration Ratings Council (BFRC) has established a labelling program for all types of domestic pedestrian doors. 

| Sep 15, 2011

EPA Releases New High-Rise Residential Energy Star Rating

The U.S. Environmental Protection Agency recently announced an Energy Star rating for multi-family high-rise buildings. 

| Sep 15, 2011

Bill Seeks To Spur Stronger Building Codes Nationwide

The Safe Building Code Incentive Act of 2011 would provide strong financial incentives for states to adopt and enforce strong building codes.  

| Sep 15, 2011

New Federal Law Limits Amount of Formaldehyde in Wood

President Obama signed into law legislation that limits the amount of formaldehyde in wood. The new measure will impact particle board and other composite wood products .

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Sep 8, 2011

OSHA issues alert on incorrectly rebuilt circuit breakers

The Occupational Safety and Health Administration (OSHA) has issued a hazard alert, warning workers and employers of certain Eaton/Cutler-Hammer molded-case circuit breakers that were incorrectly rebuilt. 

| Sep 8, 2011

USGBC Streamlines LEED EB: O&M

The Council has reorganized the prerequisite and credit structure of LEED EB: O&M. 

| Sep 8, 2011

USGBC: 30 Legislative ‘Wins For Green Building’ So Far In 2011

A mid-year report by the U.S. Green Building Council says that there have been “30 legislative wins for green building” across 22 states in 2011. 

boombox1
boombox2
native1

More In Category




Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021