ASHRAE recently launched the Building Energy Quotient (Building EQ) Portal.
The tool provides a faster, more automated approach to receive a Building EQ Performance Score. “The primary goal of the Building EQ program is to promote more energy efficient buildings and give owners actionable recommendations to improve a building’s energy use,” says Hugh Crowther, Building EQ committee chair.
The portal helps users identify opportunities to lower building operating costs and make informed decisions on steps that can increase the value of the property, ASHRAE says. Two different evaluations — In Operation, and As Designed — can be used to compare a candidate building to other similar buildings in the same climate zone or similar buildings averaged together for an assessment of a building's design potential compared to actual operation.
In Operation compares actual building energy use based on metered energy information. As Designed compares potential energy use based on the building's physical characteristics and systems with standardized energy use simulation. The In Operation rating is available now, and the As Designed rating will be available in early 2018.
To learn more about the Building EQ Portal, visit www.ashrae.org/buildingEQ.
Related Stories
| Nov 28, 2011
Armstrong acquires Simplex Ceilings
Simplex will become part of the Armstrong Building Products division.
| Nov 28, 2011
Nauset Construction completes addition for Franciscan Hospital for Children
The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.
| Nov 22, 2011
Corporate America adopting revolutionary technology
The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector.
| Nov 22, 2011
Report finds that L.A. lags on solar energy, offers policy solutions
Despite robust training programs, L.A. lacks solar jobs; lost opportunity for workers in high-need communities.
| Nov 22, 2011
Saskatchewan's $1.24 billion carbon-capture project
The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.
| Nov 22, 2011
New Green Matters Conference examines emerging issues in concrete and sustainability
High-interest topics will be covered in technical seminars, including infrared reflective coatings for heat island mitigation, innovative uses of concrete to provide cooling and stormwater management, environmental benefits of polished concrete, and advancements in functional resilience of architectural concrete.
| Nov 22, 2011
Suffolk Construction selected as contractor for Boston luxury residential tower
Project team breaks ground on 488,000-sf building that will feature world-class amenities.
| Nov 22, 2011
Jones Lang LaSalle completes construction of two new stores in Manhattan
Firm creates new global design standard serving as project manager for Uniglo’s 89,000-sf flagship location and, 64,000-sf store.