Design Criteria for Ceramic Tile/Stone Installations provides an overview of the key design elements that are required for a successful ceramic tile/stone installation, including a discussion of the importance of properly designed crack isolation, waterproofing, and sound control membranes.
Upon completing this course, you will be able to:
- Discuss the critical design elements relating to ceramic tile/stone installations that should be considered during the design and specification phases
- Explain the importance of properly designed movement joints in reducing flooring failure
- State the various construction methods and materials used to facilitate a successful ceramic tile/stone installation, and
- Explain how the features and characteristics of CPE (Chlorinated Polyethylene) composite sheet membranes in a flooring assembly contribute to the prevention of building movement failures.
Everyone that successfully completed to course will receive 1.0 HSW/LU AIA LU.
Click here to take the course. +
Related Stories
| Nov 21, 2011
Mortenson and enXco partnership to build its 19th wind project
The 8,500 acres project will generate140 megawatts of wind power – enough energy to power approximately 39,000 homes.
| Nov 21, 2011
FDH Engineering acquires Energy Solutions
All ESI employees have been merged into FDH’s staff at its St. Louis office.
| Nov 18, 2011
Centre for Interactive Research on Sustainability opens
Designed to exceed LEED Platinum, the Centre for Interactive Research on Sustainability (CIRS) is one of the most innovative and high performance buildings in North America today, demonstrating leading-edge green building design products, technologies, and systems.
| Nov 17, 2011
SmithGroup changes name to SmithGroupJJR
SmithGroup and JJR join brands to become a single, multi-disciplinary company.
| Nov 17, 2011
Campus-wide energy-efficiency program aims to deliver $3.5 million in energy and operational savings
Merced College and Honeywell will use the school’s energy usage statistics to develop a course curriculum on sustainability, and raise awareness among students of the positive impact conservation practices contribute to the community.
| Nov 17, 2011
Hollister Construction Services renovating bank in Union City, N.J.
Project is part of a series of ground-up construction and renovation assignments.
| Nov 16, 2011
Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.
This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.
| Nov 16, 2011
Architecture Billings Index moves upward
The Architecture Billings Index climbed nearly three points in October.
| Nov 16, 2011
CRSI recommends return to inch-pound markings
The intention of this resolution is for all new rollings of reinforcing steel products to be marked with inch-pound bar markings no later than January 1st, 2014.