flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New ballpark is another draw for thriving downtown in Summerlin, Nev.

Sports and Recreational Facilities

New ballpark is another draw for thriving downtown in Summerlin, Nev.

Developer Howard Hughes views the stadium as an essential piece to this master-planned community’s growth.


By John Caulfield, Senior Editor | April 12, 2019

The 10,000-person capacity Las Vegas Ballpark is located in the heart of suburban Summerlin, Nev., with a population of more than 100,000. Image: Howard Hughes Corporation

On April 9, the Las Vegas Ballpark, home to the Las Vegas Aviators Triple-A baseball team, opened in Downtown Summerlin, Nev. The club and ballpark are wholly owned by Howard Hughes Corporation, which claims this is the first minor-league ballpark in the U.S. to be built within a master-planned community.

Summerlin, on the western rim of Las Vegas, has ranked among the country’s top-10 best-selling communities for two decades. Developed by Howard Hughes Corporation, it encompasses 22,500 acres where 100,000 residents live within 250 neighborhoods. There are 6,000 acres still available for growth. Downtown Summerlin is the city’s walkable urban center with has over 125 stores. Its newer buildings include the practice facility for the Las Vegas Golden Knights pro hockey franchise.

Summerlin drew more than 18 million visitors last year, and the new $150 million ballpark, with 8,200 fixed seats and a total capacity of 10,000, is expected to be another major attraction. The Aviators, which recently changed its name from the Las Vegas 51s, plays in the Pacific Coast League and is part of the Oakland Athletics system. Prior to opening its 37th season at Las Vegas Ballpark this spring, the team had been drawing at least 300,000 fans annually at its old home, Cashman Field.

“Tonight marks a dynamic new chapter for the community of Summerlin and its thriving downtown, which continues to grow as a vibrant destination for visitors throughout Nevada, and beyond,” said David Weinreb, CEO of Howard Hughes Corporation, during opening-day ceremonies that included Nevada Governor Steve Sisolak.

The $150 million ballpark is expected to attract even more people to Summerlin, which drew 18 million visitors last year. Image: Howard Hughes Corporation

 

Las Vegas Ballpark, which sits on 7.65 acres, was designed by HOK and built by a joint venture of AECOM Hunt and Penta Building Group. From groundbreaking, the stadium took about 13 months to complete. It includes 22 suites, 400 club-level seats and 350 party-deck seats. Howard Hughes Corporation claims that the Aviators are the first team in any sport with a home field that features 4Topps Premium Seating’s breathable AirFlow Mesh seats.

The ballpark also has the largest LED video screen in Minor League Baseball. The screen, designed by South Dakota-based Daktronics, is 31-ft high by 126-ft wide, with a 13-HD pixel layout. Two ribbon displays measure 3.5-ft high by 90-ft wide and feature a 15-HD pixel layout.

 

Related Stories

Sports and Recreational Facilities | Oct 12, 2016

A wood-clad arena is rising in Copenhagen

The design of this 377,000-sf building makes concessions to the residential community that surrounds it.

Sports and Recreational Facilities | Sep 26, 2016

Julian B. Lane Riverfront Park in Tampa to undergo Skanska-led $35.6 million reconstruction project

The park will serve as an urban oasis of outdoor activities for the surrounding area.

Sports and Recreational Facilities | Sep 26, 2016

Mercedes-Benz Stadium in Atlanta will be the NFL’s first LEED Platinum stadium

The Atlanta Falcons new home is expected to save 40% in energy usage than a typical NFL stadium.

Sponsored | Reconstruction & Renovation | Sep 13, 2016

Daytona International Speedway becomes racing’s first modern stadium

Daytona International Speedway has undergone a $400 million full-scale makeover to update the facilities first built in 1959.

Sports and Recreational Facilities | Sep 1, 2016

U.S. Open stadium’s new retractable roof showcases innovative problem solving in its design and engineering

Mushy ground and indoor condensation were just two of the issues this $150 million project presented to its Building Team. 

Sports and Recreational Facilities | Aug 29, 2016

Reconstruction of Hall of Fame football stadium in Ohio moving forward

The $80 million sports facility is among the features planned for a 90-acre mixed-use village.

Sports and Recreational Facilities | Aug 22, 2016

The Hills of Governors Island reach completion one year ahead of schedule

The man made hills are the latest attraction to open on the island that has been under development since 2006.

| Aug 15, 2016

SPORTS FACILITY GIANTS: New and renovated college sports venues - designed to serve students and the community

Schools are renovating existing structures or building new sports facilities that can serve the student body and surrounding community.

| Aug 15, 2016

Top 30 Sports Facility Engineering Firms

AECOM, Thornton Tomasetti, and ME Engineers top Building Design+Construction’s annual ranking of the nation’s largest sports facility sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.

| Aug 15, 2016

Top 60 Sports Facility Construction Firms

Mortenson Construction, AECOM, and Turner Construction Co. top Building Design+Construction’s annual ranking of the nation’s largest sports facility sector construction and construction management firms, as reported in the 2016 Giants 300 Report.

boombox1
boombox2
native1

More In Category




Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021