flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New ASHRAE standard offers test method to determine heat gain of office equipment

Office Buildings

New ASHRAE standard offers test method to determine heat gain of office equipment

The standard will aid engineers in configuring cooling systems in office buildings.


By Peter Fabris, Contributing Editor | May 18, 2015
New ASHRAE standard offers test method to determine heat gain of office equipment

A new standard from ASHRAE allows a test method for determining heat gains from office equipment. Image: Pixabay/PublicDomainPictures

ASHRAE has released a new standard that provides a test method to determine the heat gain generated by office equipment.

The growing use of plug loads coupled with insufficient data on how much energy they generate present a challenge to engineers in determining how to best cool a building.

ASHRAE/ANSI Standard 203-2014, Method of Test for Determining Heat Gain of Office Equipment Used in Buildings, prescribes methods of test to determine the range and average operating heat gains of electrical equipment for use in cooling load calculations.

The standard applies to plug-load type electrical equipment. Plug loads (computers, monitors, printers, projectors, etc.) use between 20% to 50% of a building’s energy.

Increased use of computers and advances in building techniques and building envelopes have made heat gain from electrical equipment a larger factor in engineering cooling systems.

“Most plug loads operate at a fraction of their nameplate electrical load, so, as a result, produce significantly less heat load than engineers may use in their cooling load calculations based on those nameplate values,” according to an ASHRAE statement. “This can result in over-sizing of air-conditioning equipment, resulting in extra initial cost for that equipment as well as higher operating cost.”

Related Stories

Office Buildings | Mar 5, 2020

SOM design’s Disney’s New York HQ

The HQ is being built in the Hudson Square neighborhood.  

Office Buildings | Feb 13, 2020

CareerBuilder’s Chicago HQ undergoes renovation

Perkins and Will designed the project.

Office Buildings | Feb 11, 2020

Want your organization to be more creative? Embrace these 4 workplace strategies

Creativity is the secret sauce in the success of every business.

Office Buildings | Feb 11, 2020

Forget Class A: The opportunity is with Class B and C office properties

There’s money to be made in rehabbing Class B and Class C office buildings, according to a new ULI report.

Office Buildings | Feb 3, 2020

Balancing the work-life balance

For companies experiencing rapid growth, work-life balance can be a challenge to maintain, yet it remains a vital aspect of a healthy work environment.

Sponsored | HVAC | Feb 3, 2020

Reliable Building Systems Increase Net Operating Income by Retaining Tenants

Tenants increasingly expect a well-crafted property that feels unique, authentic, and comfortable—with technologically advanced systems and spaces that optimize performance and encourage collaboration and engagement. The following guidance will help owners and property managers keep tenants happy.

Office Buildings | Jan 29, 2020

Zaha Hadid Architects to build OPPO’s new Shenzhen HQ

ZHA sees your two connected towers and raises you another two.

Wood | Jan 24, 2020

105,000-sf vertical mass timber expansion will cap D.C.’s 80 M Street

Hickok Cole is designing the project.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021