flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New ASHRAE standard offers test method to determine heat gain of office equipment

Office Buildings

New ASHRAE standard offers test method to determine heat gain of office equipment

The standard will aid engineers in configuring cooling systems in office buildings.


By Peter Fabris, Contributing Editor | May 18, 2015
New ASHRAE standard offers test method to determine heat gain of office equipment

A new standard from ASHRAE allows a test method for determining heat gains from office equipment. Image: Pixabay/PublicDomainPictures

ASHRAE has released a new standard that provides a test method to determine the heat gain generated by office equipment.

The growing use of plug loads coupled with insufficient data on how much energy they generate present a challenge to engineers in determining how to best cool a building.

ASHRAE/ANSI Standard 203-2014, Method of Test for Determining Heat Gain of Office Equipment Used in Buildings, prescribes methods of test to determine the range and average operating heat gains of electrical equipment for use in cooling load calculations.

The standard applies to plug-load type electrical equipment. Plug loads (computers, monitors, printers, projectors, etc.) use between 20% to 50% of a building’s energy.

Increased use of computers and advances in building techniques and building envelopes have made heat gain from electrical equipment a larger factor in engineering cooling systems.

“Most plug loads operate at a fraction of their nameplate electrical load, so, as a result, produce significantly less heat load than engineers may use in their cooling load calculations based on those nameplate values,” according to an ASHRAE statement. “This can result in over-sizing of air-conditioning equipment, resulting in extra initial cost for that equipment as well as higher operating cost.”

Related Stories

| Dec 20, 2011

Research identifies most expensive U.S. commercial real estate markets

New York City, Washington, D.C. and San Mateo, Calif., rank highest in rents.

| Dec 20, 2011

Aragon Construction leading build-out of foursquare office

The modern, minimalist build-out will have elements of the foursquare “badges” in different aspects of the space, using glass, steel, and vibrantly painted gypsum board.

| Dec 19, 2011

Chicago’s Aqua Tower wins international design award

Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.

| Dec 19, 2011

Davis Construction breaks ground on new NIAID property

The new offices will total 490,998 square feet in a 10-story building with two wings of 25,000 square feet each. 

| Dec 14, 2011

Belfer Research Building tops out in New York

Hundreds of construction trades people celebrate reaching the top of concrete structure for facility that will accelerate treatments and cures at world-renowned institution.

| Dec 13, 2011

Lutron’s Commercial Experience Center awarded LEED Gold

LEED certification of the Lutron facility was based on a number of green design and construction features that positively impact the project itself and the broader community. These features include: optimization of energy performance through the use of lighting power, lighting controls and HVAC, plus the use of daylight.

| Dec 12, 2011

AIA Chicago announces Skidmore, Owings & Merrill as 2011 Firm of the Year

SOM has been a leader in the research and development of specialized technologies, new processes and innovative ideas, many of which have had a palpable and lasting impact on the design profession and the physical environment. 

| Dec 12, 2011

CRSI design awards deadline extended to December 31

The final deadline is extended until December 31st, with judging shortly thereafter at the World of Concrete.

| Dec 12, 2011

Mojo Stumer takes top honors at AIA Long Island Design Awards

Firm's TriBeCa Loft wins "Archi" for interior design.

| Dec 10, 2011

10 Great Solutions

The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021