flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New ASHRAE standard defines ‘zero energy’ and ‘zero carbon’ buildings

Codes and Standards

New ASHRAE standard defines ‘zero energy’ and ‘zero carbon’ buildings

The standard draws from other ASHRAE standards to address energy and carbon flows across a site boundary, their measurement, and their balance.


By Peter Fabris, Contributing Editor | May 8, 2023
Photo by Dids via Pexels

Photo by Dids via Pexels

ASHRAE has released a new standard that defines the terms "zero Energy" and "zero carbon" to describe buildings.

ANSI/ASHRAE Standard 228-2023, Standard Method of Evaluating Zero Net Energy and Zero Net Carbon Building Performance, sets requirements for evaluating whether a building or group of buildings meets a definition of “zero net energy” or a definition of “zero net carbon” during operation. The standard draws from other ASHRAE standards to address energy and carbon flows across a site boundary, their measurement, and their balance.

“Achieving a zero energy building has been viewed by many as a difficult goal to meet, with unforeseeable roadblocks and differing guidance,” said Keith Emerson, P.E., Life Member ASHRAE, chair of the Standards Project Committee 228. Standard 228 provides a consistent method for determining whether new and existing sites have reached zero energy. We hope this standard will become a helpful resource for building professionals in strategic decarbonization planning.”

Features of Standard 228 include:

  • Allowances for sites that lack the means to produce adequate renewable energy, while placing additional requirements on the use of external carbon and renewable energy in the calculation.
  • Defined calculation of energy in terms of source—a multiplier on the energy crossing the site boundary including energy used or lost in extraction, generation, and transit to the site.
  • The main energy calculation made in terms of annual average factors. Allowance is made for the calculation of individual hours where data is available.

Related Stories

Codes and Standards | Jul 24, 2019

New York making slow progress on resiliency seven years after Hurricane Sandy

Property owners face many challenges; coastal defense project plans are complex and need more time to plan.

Codes and Standards | Jul 23, 2019

Berkeley, Calif. passes nation’s first ordinance to make new buildings all-electric

No gas hook-ups will be allowed in new houses, apartments, and commercial buildings.

Codes and Standards | Jul 22, 2019

San Francisco office building is city’s first structure certified by BREEAM USA for existing buildings

The Landmark @ One Market is one of San Francisco’s most architecturally distinctive buildings.

Codes and Standards | Jul 15, 2019

USGBC calls for proposals for feedback, concepts for next LEED version

The move follows successful public input on LEED 4.1.

AEC Tech | Jul 15, 2019

Lack of standards hampers development of exoskeleton industry

Guidelines, common terminology, and testing methodology are needed, says expert. 

Concrete | Jul 8, 2019

Concrete repair code requirements released

American Concrete Institute offers guidance on assessment, repair, rehab of existing concrete structures.

K-12 Schools | Jul 8, 2019

Collaborative for High Performance Schools releases 2019 Core Criteria Version 3.0 Update

The update adds credits to lower carbon footprints and to promote climate change resiliency.

Wood | Jul 8, 2019

Campaign launched to promote ‘climate-smart wood’

The Forest Stewardship Council and other groups aim to help buyers understand and make it easier to locate lumber that meets sustainable forestry standards.

Urban Planning | Jul 8, 2019

U.S. cities experience ‘Doppler shift’ in walkable urban development

The walkability trend is spreading to urbanizing suburbs.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021