flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New ASHRAE standard defines ‘zero energy’ and ‘zero carbon’ buildings

Codes and Standards

New ASHRAE standard defines ‘zero energy’ and ‘zero carbon’ buildings

The standard draws from other ASHRAE standards to address energy and carbon flows across a site boundary, their measurement, and their balance.


By Peter Fabris, Contributing Editor | May 8, 2023
Photo by Dids via Pexels

Photo by Dids via Pexels

ASHRAE has released a new standard that defines the terms "zero Energy" and "zero carbon" to describe buildings.

ANSI/ASHRAE Standard 228-2023, Standard Method of Evaluating Zero Net Energy and Zero Net Carbon Building Performance, sets requirements for evaluating whether a building or group of buildings meets a definition of “zero net energy” or a definition of “zero net carbon” during operation. The standard draws from other ASHRAE standards to address energy and carbon flows across a site boundary, their measurement, and their balance.

“Achieving a zero energy building has been viewed by many as a difficult goal to meet, with unforeseeable roadblocks and differing guidance,” said Keith Emerson, P.E., Life Member ASHRAE, chair of the Standards Project Committee 228. Standard 228 provides a consistent method for determining whether new and existing sites have reached zero energy. We hope this standard will become a helpful resource for building professionals in strategic decarbonization planning.”

Features of Standard 228 include:

  • Allowances for sites that lack the means to produce adequate renewable energy, while placing additional requirements on the use of external carbon and renewable energy in the calculation.
  • Defined calculation of energy in terms of source—a multiplier on the energy crossing the site boundary including energy used or lost in extraction, generation, and transit to the site.
  • The main energy calculation made in terms of annual average factors. Allowance is made for the calculation of individual hours where data is available.

Related Stories

Digital Twin | Aug 9, 2021

Digital Twin Maturity white paper offers guidance on digital twin adoption

Provides lifecycle map and an approach for incorporating digital twins.

Codes and Standards | Aug 5, 2021

Contractors can be liable for building failures many years after project completion

Personal injury suits could be brought decades after substantial completion.

Codes and Standards | Aug 4, 2021

Mass timber is a natural choice for building recycling through deconstruction

Designing wood buildings to optimize recovery of materials for disassembly aids carbon sequestration.

Codes and Standards | Aug 3, 2021

Dept. of Energy releases initial version of the Spawn of EnergyPlus software

Targets new use cases in advanced controls, district systems, and grid integration.

Codes and Standards | Aug 2, 2021

Several U.S. cities among most expensive places to build in the world

San Francisco, New York, and Boston head the domestic list.

Codes and Standards | Jul 28, 2021

American Concrete Institute creates new director of innovative concrete technology post

Aim is to attract emerging technologies for development.

Codes and Standards | Jul 28, 2021

Higher ed faces infrastructure backlog of $112.3 billion

Study recommends integrated strategic planning for best results.

Codes and Standards | Jul 27, 2021

Add a wobbly moon to flooding risk factors

Earth satellite’s orbit variations will lead to sunny-day flooding in the mid-2030s.

Codes and Standards | Jul 26, 2021

Revamping of Florida building codes on the table after condo collapse

Tragedy could prompt upgrades like post-Hurricane Andrew effort.

Codes and Standards | Jul 21, 2021

Proposal to give Calif. hospitals more time for earthquake retrofits stirs controversy

State hospital association says 2030 deadline should be extended.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021