flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New ASHRAE guideline for commissioning existing systems and assemblies

Codes and Standards

New ASHRAE guideline for commissioning existing systems and assemblies

Focuses on optimum facility and system operation.


By Peter Fabris, Contributing Editor | October 2, 2015
ASHRAE guideline

The step-by-step ASHRAE guideline process leads owners and facility managers through the steps of ensuring optimum effectiveness from their facility for the lowest investment.

A new guideline, ASHRAE Guideline 0.2-2015, Commissioning Process for Existing Building Systems and Assemblies, is geared to helping commissioning providers ensure optimized operation of their facilities and systems. 

The document outlines a systematic quality-oriented process that improves the performance and sustainability of existing facilities, ASHRAE says. It includes information about planning, assessing, investigating, implementing, verifying, and documenting performance to meet operational requirements.

The step-by-step process guides owners and facility managers through the process of ensuring optimum effectiveness from their facility for the lowest investment and provides the tools to ensure those benefits last for the life of the building. It expands on the commissioning principles developed in ASHRAE Guideline 0.  

“Guideline 0.2 provides commissioning providers with the latest tools needed to address the growing market of commissioning existing buildings that require improvements to reduce energy consumption, improve occupant comfort, and increase operational efficiency,” Tom Cappellin, vice chair of the committee that wrote the guideline, said.

Related Stories

Codes and Standards | Oct 24, 2019

ASHRAE design contest winners demonstrate building resilience

Model building, a city hall, could operate without utility service for two weeks.

Codes and Standards | Oct 22, 2019

Efficient material design, low-carbon concrete are critical to cutting GHG emissions in construction

Enhancing building utilization and reusing materials also aid carbon reduction.

Codes and Standards | Oct 18, 2019

St. Louis could save $61 million per year in energy costs by improved building performance

GHG gases can be reduced by at least 11% with upgrades to public buildings and large private buildings.

Codes and Standards | Oct 17, 2019

Slow payments cost GCs and subs $64 billion annually

Study finds 51-day average payment turnaround.

Codes and Standards | Oct 16, 2019

Cool pavement can make people hotter

Reflective coatings channel sunlight raising temperatures where pedestrians walk.

Codes and Standards | Oct 15, 2019

Utah adopts 2018 International Energy Conservation Code

Provisions include increased building envelope performance and reduced air infiltration.

Codes and Standards | Oct 14, 2019

States continue to beef up energy efficiency codes

ACEEE 50-state scorecard finds latest IECC code gaining adherents.

Codes and Standards | Oct 9, 2019

DOE releases Better Buildings Healthcare Financing Primer

Outlines financial strategies to implement energy-efficiency projects in healthcare.

Codes and Standards | Oct 8, 2019

Zero Carbon Buildings for All aims for ambitious emission reduction targets

Organization makes commitment to net zero carbon for all buildings by 2050.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021