flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New ASHRAE guideline for commissioning existing systems and assemblies

Codes and Standards

New ASHRAE guideline for commissioning existing systems and assemblies

Focuses on optimum facility and system operation.


By Peter Fabris, Contributing Editor | October 2, 2015
ASHRAE guideline

The step-by-step ASHRAE guideline process leads owners and facility managers through the steps of ensuring optimum effectiveness from their facility for the lowest investment.

A new guideline, ASHRAE Guideline 0.2-2015, Commissioning Process for Existing Building Systems and Assemblies, is geared to helping commissioning providers ensure optimized operation of their facilities and systems. 

The document outlines a systematic quality-oriented process that improves the performance and sustainability of existing facilities, ASHRAE says. It includes information about planning, assessing, investigating, implementing, verifying, and documenting performance to meet operational requirements.

The step-by-step process guides owners and facility managers through the process of ensuring optimum effectiveness from their facility for the lowest investment and provides the tools to ensure those benefits last for the life of the building. It expands on the commissioning principles developed in ASHRAE Guideline 0.  

“Guideline 0.2 provides commissioning providers with the latest tools needed to address the growing market of commissioning existing buildings that require improvements to reduce energy consumption, improve occupant comfort, and increase operational efficiency,” Tom Cappellin, vice chair of the committee that wrote the guideline, said.

Related Stories

Codes and Standards | Mar 4, 2021

Biden administration overturns Trump’s federal building design mandate

Previous order promoted classical and “traditional” architecture above others.

Codes and Standards | Mar 3, 2021

Texas freeze raises questions about risks of electrifying buildings

Gas stoves helped residents cook, boil water when power went out.

Codes and Standards | Mar 2, 2021

New Seattle building code eliminates fossil fuels for most space and water heating

Also increases on-site solar photovoltaics, reduces envelope heat loss, air leakage, and interior lighting power allowances.

Codes and Standards | Feb 25, 2021

It’s not just lumber—roofing material prices are also on the rise

Lower demand for petroleum products means less asphalt production.

Codes and Standards | Feb 23, 2021

ASHRAE Epidemic Task Force releases updated Building Readiness Guide

Includes flush calculations to reduce time and energy to clear contaminants between occupancy periods.

Codes and Standards | Feb 22, 2021

Preservation of Affordable Housing develops climate resilience strategy

Includes backup power for resident and staff “area of refuge”.

Codes and Standards | Feb 18, 2021

Construction industry moves toward comprehensive U.S. BIM standard

NIBS hosts roundtable to create coordinated program to advance collaboration.

Codes and Standards | Feb 17, 2021

Construction on international sports venues is ripe for corruption

Poor planning, complex contracting, a lack of accountability and high levels of collusion to blame.

Codes and Standards | Feb 16, 2021

Feds may fund removal of some urban highways

Senate bill proposes pilot program to reknit communities.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021