A new guideline, ASHRAE Guideline 0.2-2015, Commissioning Process for Existing Building Systems and Assemblies, is geared to helping commissioning providers ensure optimized operation of their facilities and systems.Ā
The document outlines a systematic quality-oriented process that improves the performance and sustainability of existing facilities, ASHRAE says. It includes information about planning, assessing, investigating, implementing, verifying, and documenting performance to meet operational requirements.
The step-by-step process guides owners and facility managers through the process of ensuring optimum effectiveness from their facility for the lowest investment and provides the tools to ensure those benefits last for the life of the building. It expands on the commissioning principles developed in ASHRAE Guideline 0. Ā
āGuideline 0.2 provides commissioning providers with the latest tools needed to address the growing market of commissioning existing buildings that require improvements to reduce energy consumption, improve occupant comfort, and increase operational efficiency,ā Tom Cappellin, vice chair of the committee that wrote the guideline, said.
Related Stories
| Sep 1, 2011
Project Aims to Automate Code Compliance Assessment
FIATECH, a consortium of owners from the industrial, power, and retail markets that build large structures, launched a project this year to validate the use of automation technology for code compliance assessment, and to accelerate the regulatory approval process using building models. Long-term objectives include the development of an extensive, open-source rule set library that is approved by industry and regulatory bodies for use by technology developers and code officials.
| Sep 1, 2011
EPA Says Additional Lead Paint Cleaning Rules Not Necessary
The EPA has concluded that current Lead: Renovation, Repair, and Painting Program (LRRP) cleaning requirements and lead-safe work regulations are sufficient to protect the public from lead dust hazards. āOur members have been instrumental in contacting legislators to detail the detrimental impact of the current LRRP," says Richard Walker, American Architectural Manufacturers Associationās president and CEO. āThis collective industry voice has prompted the EPA to make the responsible decision to refrain from adding further, unnecessary costs to homeowners under the current economic climate."http://www.aamanet.org/news/1/10/0/all/603/aama-commends-its-members-congress-for-vacating-lrrp-clearance-rule
| Aug 11, 2010
Best AEC Firms of 2011/12
Later this year, we will launch Best AEC Firms 2012. Weāre looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +