flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New ASHRAE guideline for commissioning existing systems and assemblies

Codes and Standards

New ASHRAE guideline for commissioning existing systems and assemblies

Focuses on optimum facility and system operation.


By Peter Fabris, Contributing Editor | October 2, 2015
ASHRAE guideline

The step-by-step ASHRAE guideline process leads owners and facility managers through the steps of ensuring optimum effectiveness from their facility for the lowest investment.

A new guideline, ASHRAE Guideline 0.2-2015, Commissioning Process for Existing Building Systems and Assemblies, is geared to helping commissioning providers ensure optimized operation of their facilities and systems. 

The document outlines a systematic quality-oriented process that improves the performance and sustainability of existing facilities, ASHRAE says. It includes information about planning, assessing, investigating, implementing, verifying, and documenting performance to meet operational requirements.

The step-by-step process guides owners and facility managers through the process of ensuring optimum effectiveness from their facility for the lowest investment and provides the tools to ensure those benefits last for the life of the building. It expands on the commissioning principles developed in ASHRAE Guideline 0.  

“Guideline 0.2 provides commissioning providers with the latest tools needed to address the growing market of commissioning existing buildings that require improvements to reduce energy consumption, improve occupant comfort, and increase operational efficiency,” Tom Cappellin, vice chair of the committee that wrote the guideline, said.

Related Stories

Codes and Standards | Jan 13, 2017

New BIM guide for owners released

National Institute of Building Sciences releases a manual for developing standard set of BIM documents.

Codes and Standards | Jan 11, 2017

OSHA prompts more proactive approach to construction site safety

Remote operated camera systems are being used to mitigate risk in real time.

Codes and Standards | Jan 10, 2017

Plunging solar power costs making PVs more compelling for owners, developers

Technical and manufacturing advances are driving down prices.

Codes and Standards | Jan 9, 2017

Boston’s plans for new development at odds with flood projections

One plan calls for building in areas predicted to be flooded during high tides as sea levels rise.

Codes and Standards | Jan 9, 2017

New LEED for Cities, LEED for Communities pilot certifications unveiled

Requires tracking of performance data and progress toward goals. 

Codes and Standards | Jan 9, 2017

China claims top ranking outside of U.S. for total LEED-certified space

Canada, India, Brazil, and Korea round out top 5.

Codes and Standards | Jan 6, 2017

OSHA prompts more proactive approach to construction site safety

Remote operated camera systems are being used to mitigate risk in real time.

Codes and Standards | Jan 5, 2017

2018 building energy code upholds efficiency gains

Efforts to scale back efficiency requirements largely defeated.

Codes and Standards | Jan 4, 2017

Low-income housing doesn’t lower neighborhood housing values

A Trulia study contradicts longstanding fears.

Codes and Standards | Jan 3, 2017

Intelligent transportation systems have implications for designers, construction firms

Sensors and Internet of Things devices will have to be embedded in infrastructure.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021