flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New ASHRAE guideline for commissioning existing systems and assemblies

Codes and Standards

New ASHRAE guideline for commissioning existing systems and assemblies

Focuses on optimum facility and system operation.


By Peter Fabris, Contributing Editor | October 2, 2015
ASHRAE guideline

The step-by-step ASHRAE guideline process leads owners and facility managers through the steps of ensuring optimum effectiveness from their facility for the lowest investment.

A new guideline, ASHRAE Guideline 0.2-2015, Commissioning Process for Existing Building Systems and Assemblies, is geared to helping commissioning providers ensure optimized operation of their facilities and systems. 

The document outlines a systematic quality-oriented process that improves the performance and sustainability of existing facilities, ASHRAE says. It includes information about planning, assessing, investigating, implementing, verifying, and documenting performance to meet operational requirements.

The step-by-step process guides owners and facility managers through the process of ensuring optimum effectiveness from their facility for the lowest investment and provides the tools to ensure those benefits last for the life of the building. It expands on the commissioning principles developed in ASHRAE Guideline 0.  

“Guideline 0.2 provides commissioning providers with the latest tools needed to address the growing market of commissioning existing buildings that require improvements to reduce energy consumption, improve occupant comfort, and increase operational efficiency,” Tom Cappellin, vice chair of the committee that wrote the guideline, said.

Related Stories

Codes and Standards | Apr 18, 2018

New Green Globe pilot program launched

Precursor to revised Green Globes Assessment Protocol for Commercial Buildings.

Codes and Standards | Apr 17, 2018

Contractor charged with fraud in winning $200 million in federal contracts

Accused of falsely claiming veteran- and minority-owned business status.

Codes and Standards | Apr 16, 2018

Wide variations in adoption of National Electric Code could jeopardize safety

An NFPA report found that code adoption is under heavier political scrutiny, leading to delays and decisions motivated by factors other than safety concerns. 

Codes and Standards | Apr 12, 2018

Corruption in New York City construction industry is common

Scale of projects, number of players involved contributes to problem.

Codes and Standards | Apr 11, 2018

Urgent need for government to make communities, infrastructure more resilient

More than 350 people died from extreme weather events in 2017.

Codes and Standards | Apr 10, 2018

Boosting energy efficiency helps reduce health risks

Cleaner air results in fewer heart attacks, respiratory disease, and premature deaths.

Codes and Standards | Apr 9, 2018

U.K. business leaders call for zero-carbon buildings by 2030

Real estate, construction industry executives among those supporting the goal.

Codes and Standards | Apr 4, 2018

New ASTM standard supports stucco use in construction

Provides way to measure tensile strength in vertical applications.

Codes and Standards | Apr 3, 2018

LEED v4.1 O+M for Existing Buildings available for beta testing

Update said to be most inclusive and transparent platform to date.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021