flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New ASHRAE guideline for commissioning existing systems and assemblies

Codes and Standards

New ASHRAE guideline for commissioning existing systems and assemblies

Focuses on optimum facility and system operation.


By Peter Fabris, Contributing Editor | October 2, 2015
ASHRAE guideline

The step-by-step ASHRAE guideline process leads owners and facility managers through the steps of ensuring optimum effectiveness from their facility for the lowest investment.

A new guideline, ASHRAE Guideline 0.2-2015, Commissioning Process for Existing Building Systems and Assemblies, is geared to helping commissioning providers ensure optimized operation of their facilities and systems. 

The document outlines a systematic quality-oriented process that improves the performance and sustainability of existing facilities, ASHRAE says. It includes information about planning, assessing, investigating, implementing, verifying, and documenting performance to meet operational requirements.

The step-by-step process guides owners and facility managers through the process of ensuring optimum effectiveness from their facility for the lowest investment and provides the tools to ensure those benefits last for the life of the building. It expands on the commissioning principles developed in ASHRAE Guideline 0.  

“Guideline 0.2 provides commissioning providers with the latest tools needed to address the growing market of commissioning existing buildings that require improvements to reduce energy consumption, improve occupant comfort, and increase operational efficiency,” Tom Cappellin, vice chair of the committee that wrote the guideline, said.

Related Stories

Codes and Standards | Dec 4, 2018

Action on building codes would spur low-carbon cities

Faster retrofit cycles, increased energy-efficiency requirements for existing buildings needed.

Codes and Standards | Nov 30, 2018

Best solution to prevent California wildfire disasters: Stop building in places likely to burn

Approach would be unpopular as people attracted to stunning wooded landscapes.

Codes and Standards | Nov 29, 2018

USGBC and BRE form partnership

Two green standards groups will collaborate on standards, platforms, and research.

Codes and Standards | Nov 29, 2018

Parking garages in N.Y. State will have to be inspected every three years

Professional engineer must assess conditions.

Codes and Standards | Nov 28, 2018

To build water-efficient cities, water managers and urban planners must coordinate better

Lack of time and resources, and practitioners not in habit of working together hamper efforts.

Codes and Standards | Nov 26, 2018

All LEED-certified buildings eligible for LEED recertification

Projects must submit 12 months of data demonstrating continued or improved performance.

Codes and Standards | Nov 20, 2018

OSHA publishes updates to crane operator certification requirements

Long-delayed rules accept certifications by type or type and capacity.

Codes and Standards | Nov 19, 2018

Guide offers understanding of elements that create successful multi-floor communal spaces

CTBUH technical document analyzes how to approach tall urban habitat.

Codes and Standards | Nov 16, 2018

2018 International Green Construction Code released

Updated version helps governments streamline code development and adoption.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021