As a growing number of healthcare institutions become more customer-focused, post-occupancy evaluations (POE) are playing a bigger role in new construction and renovation projects. Advocate Health Care is among the healthcare organizations to institute a detailed post-occupancy assessment process for its projects.
The three-part POE process includes a mix of web-based surveys, walkthroughs, group interviews, and building-performance documentation at different stages of the project. The process has resulted in a much clearer picture of the success of construction projects.
You can learn more about Advocate Health Care's new POE process at BUILDINGChicago. Advocate's Construction Project Manager Tim Bassett is co-hosting (with design professionals from VOA Inc.) a continuing education class based on the organization's POE system, and how it was applied for the recently completed Advocate BroMenn Medical Center.
Bassett's session, "A New Post-occupancy Evaluation Process at Advocate BroMenn Medical Center" (Tuesday, September 10, 10:30 am - 12:00 pm), is one of more than 70 continuing education classes at the BUILDINGChicago show, which takes place September 9-11 at the Holiday Inn Chicago Mart Plaza.
For more information on attending the show, visit: http://www.buildingchicagoexpo.com/.
Related Stories
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.
| May 24, 2012
Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion
The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.