As a growing number of healthcare institutions become more customer-focused, post-occupancy evaluations (POE) are playing a bigger role in new construction and renovation projects. Advocate Health Care is among the healthcare organizations to institute a detailed post-occupancy assessment process for its projects.
The three-part POE process includes a mix of web-based surveys, walkthroughs, group interviews, and building-performance documentation at different stages of the project. The process has resulted in a much clearer picture of the success of construction projects.
You can learn more about Advocate Health Care's new POE process at BUILDINGChicago. Advocate's Construction Project Manager Tim Bassett is co-hosting (with design professionals from VOA Inc.) a continuing education class based on the organization's POE system, and how it was applied for the recently completed Advocate BroMenn Medical Center.
Bassett's session, "A New Post-occupancy Evaluation Process at Advocate BroMenn Medical Center" (Tuesday, September 10, 10:30 am - 12:00 pm), is one of more than 70 continuing education classes at the BUILDINGChicago show, which takes place September 9-11 at the Holiday Inn Chicago Mart Plaza.
For more information on attending the show, visit: http://www.buildingchicagoexpo.com/.
Related Stories
| Apr 10, 2013
6 funding sources for charter school construction
Competition for grants, loans, and bond financing among charter schools is heating up, so make your clients aware of these potential sources.
| Apr 10, 2013
23 things you need to know about charter schools
Charter schools are growing like Topsy. But don’t jump on board unless you know what you’re getting into.
| Apr 9, 2013
FMI predicts 8% rise in construction put in place for 2013
FMI, the largest provider of management consulting and investment banking services to the engineering and construction industry released today its Q1-2013 Construction Outlook. The forecast for total construction-put-in-place for 2013 continues to show an increase of 8% over 2012 levels.
| Apr 8, 2013
Most daylight harvesting schemes fall short of performance goals, says study
Analysis of daylighting control systems in 20 office and public spaces shows that while the automatic daylighting harvesting schemes are helping to reduce lighting energy, most are not achieving optimal performance, according to a new study by the Energy Center of Wisconsin.
| Apr 6, 2013
Lord, Aeck & Sargent and Urban Collage merge
In a move that brings full-service planning expertise to its already well-established architecture practice, Lord, Aeck & Sargent (LAS) has merged with Urban Collage (UC), one of the largest urban and campus planning and design firms in the Southeast. Combining these firms’ talents was made official today. UC plans to retain its name for the foreseeable future.