The Rae at Westlake, a contemporary style 343-unit multifamily community located in Bethesda’s urban core, has broken ground.
The five-story building is designed to create diverse housing options to meet the needs of young professionals in Bethesda seeking an amenity-rich community that promotes an active lifestyle. Forty-four of the units will be dedicated to Montgomery County’s Moderately Priced Housing program.
The project will offer a mix of studio, one-bedroom, one-bedroom plus den, and two-bedroom floorpans ranging from 486 to 1,157 sf. Amenities will include a fitness center; a coworking lounge; a pet spa; a club room; a swimming pool; and a large courtyard with barbecue grills, hammocks, and an outdoor fireplace.
The Rae at Westlake will connect residential living to the urban setting in a highly commercialized area. The amenity and residential massing are rotated in opposite directions to contrast and create visual interest. Residential bars projecting lightly from the building base increase geometric folds toward the corner to take advantage of the site geometry and carry the triangular-shape motif.
Light and dark color composition alternate on top of a warm tone wood-like base with large glass positioned uniquely on the angled amenity corner. Sustainable elements include over 7,000 sf of green room and 5,000 sf of bioretention around the building’s perimeter.
In addition to KTGY the build team also includes MSA Interiors (interior architect), LandDesign (landscape architect), Alliance Engineers (electrical and structural engineer), SSA (mechanical and plumbing engineer), and Vika (civil engineer). The project is slated to complete in Q3 of 2023.
Related Stories
Coronavirus | May 26, 2020
Multifamily developers report mounting delays in permitting and starts due to coronavirus pandemic
More than half (53%) of multifamily developer respondents reported construction delays in the jurisdictions where they operate, according to the third edition of the National Multifamily Housing Council (NMHC) COVID-19 Construction Survey.
Multifamily Housing | May 8, 2020
Nashville's newest residential tower will rise 416 feet
Goettsch Partners is designing the project.
Multifamily Housing | May 8, 2020
'Lakehouse' is the first multifamily project in Colorado to receive WELL Precertification
Stantec and Muñoz + Albin are the project's architects.
Senior Living Design | May 5, 2020
5 memory care communities with a strong sense of mission
Communities in California, Colorado, Florida, Maryland, and Virginia display excellence in memory care facility development, design, and construction.
Multifamily Housing | Apr 23, 2020
Tankless water heaters: 12 things to know about these energy savers for multifamily housing
Twelve factors to consider in using tankless water heaters in multifamily housing.
Multifamily Housing | Apr 20, 2020
Multifamily market flattens as construction proposal activity sinks
Multifamily has consistently been one of the strongest performers among 58 submarkets measured in PSMJ Resources’ quarterly survey.
Coronavirus | Apr 15, 2020
COVID-19 alert: 93% of renters in professionally managed multifamily housing paid some or all of their rent, says NMHC
In its second survey of 11.5 million units of professionally managed apartment units across the country, the National Multifamily Housing Council (NMHC) found that 84% of apartment households made a full or partial rent payment by April 12, up 15 percentage points from April 5.
Multifamily Housing | Apr 15, 2020
Related Group picks Stantec to design and engineer Manor Miramar residences in Florida
Related Group picks Stantec to design and engineer Manor Miramar residences in Florida.
Coronavirus | Apr 5, 2020
COVID-19: Most multifamily contractors experiencing delays in projects due to coronavirus pandemic
The NMHC Construction Survey is intended to gauge the magnitude of the disruption caused by the COVID-19 outbreak on multifamily construction.